Stage 4 - infrastructure comprises the construction of the following major items:
construction of about 1 630m long of new roads covering part of Road D2, Road L6 and Road L19;
reconstruction and widening of sections of existing footpaths at Sung Wong Toi Road and To Kwa Wan Road;
construction of two sewage pumping stations, about 2 000m long of twin rising mains and 2 300m long of gravity sewer;
construction of stormwater drains including about 3 600m long of road drains and 430m long of box culverts;
associated footpaths, street lighting, traffic aids, water mains and landscaping works; and
provision of necessary environmental mitigation measures and implementation of an environmental monitoring and audit programme for the works associated with the above works
Contract No. KL/2012/03
Scope: same as project scope for Stage 4 above
Commencement Date: 19 September 2013
Completion Date: Q3 2018
Contract Sum: $793 million
Contractor: Kwan On Construction Company Limited |