The scope of Stage 3 comprises:
construction of the following items of works located at the former south apron area –
(i) reconstruction and widening of Shing Cheong Road and part of Cheung Yip Street from the existing single 2-lane roads to form dual 2-lane roads with a total length of about 0.7 km; and
(ii) construction of a supporting underground structure of about 0.4 km long along Shing Cheong Road and across Cheung Yip Street as enabling works to facilitate future construction of Trunk Road T2;
construction of associated footpaths, pedestrian streets, street lighting, traffic aids, drainage, sewerage, water mains, landscaping and ancillary works; and
construction of two sewage pumping stations, about 2 000m long of twin rising mains and 2 300m long of gravity sewer;
implementation of environmental mitigation measures and an environmental monitoring and audit programme for the works mentioned above.
Contract No. KL/2014/03
Scope: same as project scope for the Stage 3 above
Commencement Date: 23 November 2015
Completion Date: end 2019
Contract Sum: $2.176 billion
Contractor: China Road and Bridge Corporation |