The scope of Stage 5A infrastructure works comprises the following major items: construction of a single two-lane Road L7 of about 140 m long and a section of dual two-lane Road D1 of about 470 m long connecting with Concorde Road; construction of a single-lane slip road S15 of about 160 m long linking the proposed Road D1 with existing flyover K72 for connection with PERE eastbound; construction of a pedestrian subway SW6 of about 120 m long across PERE connecting the future preservation corridor for the Lung Tsun Stone Bridge remnants in KTD and Shek Ku Lung Road Playground; construction of associated footpaths, street lighting, traffic aids, drainage including about 830 m long box culverts, sewerage, water mains, landscaping and ancillary works; and implementation of environmental mitigation measures and related EM&A programme. Contract No. KL/2015/03 Scope: Same as project scope for the Stage 3B above Commencement Date: 30 December 2016 Completion Date: End 2020 Contract Sum: $553 million Contractor: Build King - Richwell Engineering Joint Venture |