Project Detail |
The scope of Stage 3B infrastructure works comprises the following major items: construction of a section of dual two-lane Road L2 of about 320 metres (m) long connecting Shing Kai Road with Concorde Road, and a pair of single-lane slip roads of about 650 m long linking the eastbound Prince Edward Road East (PERE) with San Po Kong; construction of an elevated landscaped walkway LW4 of about 290 m long across PERE connecting San Po Kong and Kai Tak Development (KTD); demolition of existing flyover K9 in San Po Kong across PERE; construction of a pedestrian subway SW4 of about 180 m long across PERE, Kwun Tong Bypass and Shing Kai Road connecting Choi Hung Estate and KTD; road modification works in San Po Kong area; construction of associated footpaths, street lighting, traffic aids, drainage, sewerage, water mains, landscaping and ancillary works; and implementation of environmental mitigation measures and related environmental monitoring and audit (EM&A) programme. Contract No. KL/2015/02 Scope: Same as project scope for the Stage 5A above Commencement Date: 28 September 2016 Completion Date: End 2020 Contract Sum: $586 million Contractor: Peako – Wo Hing Joint Venture |