Project Detail |
SPIL has implemented a 5 MW cogeneration power project based on rice husk. The power will be produced by 5MW extraction-cum-condensing steam turbine with alternator. Major equipment of the power project comprises of 50 tonne per hour (TPH) capacity single drum travel grate type boiler. The average inflow of extraction steam is 30 tonne per hour, which is used for process steam requirement in the paper machine section. In pre project scenario the heat and power requirement was met using low-pressure boiler with 3 MW turbine, wherein the remaining power is imported from grid. The GHG emission reductions are from electricity generation. It would substitute electricity generation of NEWNE grid of India dominated by coal based power plants, and thus would reduce coal consumption.
Project ID
1547
Project Proponent
MULTIPLE PROJECT PROPONENTS
Project Status
Registered
Sectoral Scope
1. Energy (renewable/non-renewable)
Project Methodology
ACM0006
Project Validator
KBS Certification Services Pvt. Ltd.
Registry
APX
Estimated Annual Emission Reductions
28,442 |