1. Location: Dong Van commune (Yen Lac Dist.) and Hop Thinh Commune (Tam Duong Dist.), Vinh Phuc Province
2. Current situation: Current hospital over loaded, located in the center of the city, small scale, infrastructure not meet the demand of services.
3. Target and scale:
Target: To serve high quality hospitality services; citizen ables to approach modern healthcare services; healthcare services for foreign experts, foreigner, and high income people;
Scale: Total Area: 9.9ha. Includes 500 hospital beds. Total floor area: 58,216 m2, included: Stay-in treatment building: 14 floors, area of 8,338m2; total floor area 50,547m2; services hall: 5 floors, construction area: 860m2; total floor area: 4,340m2; dietary building: 2 floors, total construction area 1,215m2, total floor area: 2,116m2; General contagious diseases building: 3 floors, total construction area: 563m2, total floor area: 1.689m2; Anti-infective house: 02 floors, total construction floor: 480m2; total floor area: 1,689m2. Pathological operation and mortuary mourning building: 01 floor, total construction area 680m2, total floor area 680m2. Other supporting equipment and items. Equipment: Modern medical equipment, comprehensive with the main building according to the standard of Vietnam.
4. Estimated Investment Capital: about USD 68.6 million |