Pre-feasibility study of the best location for Bandar Abbas Sea Water Intake Project (4,800,000 m³/day)
The location of the intake along the shore of the Persian Gulf is set to be at a distance of about 10 kilometers west of Bandar Abbas, next to the Sadra ship making Co.
The intake capacity from the sea will be 4,800,000 m3 /day. The entire capacity will be used for producing 1,000,000 m3 /daypotable water as well as power plant needs.
Cause Way construction, Access Road and Landscaping