Project Detail |
The project calls for the construction of concrete hard stands for aircraft parking around the new Midfield Terminal Building, including contact and remote stands, taxi lanes along the apron parking stands and link taxiway connections to the existing airside infrastructure with a tunnel on the airside, earthwork, concrete pavement, asphalt pavement with markings, drainage, general utilities, airfield ground lighting, gate services such as flood lighting, visual dock guidance system and structural works/systems for airside tunnel, aircraft fuel hydrant system, storm & portable water distribution line, chilled water distribution system, medium voltage distribution Sub Stations, communication network and fire main distribution system on the major utility segments.
|