Date: 2017
Contract No: 4400007989
Location: Al-Nuzhah District, Jeddah, Saudi Arabia.
Description:
The scope of work includes the design, engineer, procure, supply and deliver all equipment and materials, installation, commissioning and handing over complete and in satisfactory operational condition the fully functional new 110/13.8kV Al Jawad Substation, Including Reinforcement of Generation at PP3 Power Plant.
Major Equipment:
Ten (10) nos. 110 kV Gas Insulated Switchgear (GIS) bays • Three (3) nos. 50/67 MVA, 110/13.8 kV Power Transformers • 44 nos. 13.8 kV Switchgear cubicles • Three (3) nos. 13.8kV, 7 MVAR Shunt Capacitor Banks • Substation Automation System (SAS).
|