Project Detail |
Construction/Pre-commissioning of offshore Pipelines:
• Offshore pipelines used for conveying oil, gas and water products.
• Carbon steel pipes. Pipe sizes 4” to 28”. Total length 98km.
• Offshore Fiber Optic cable (10km)
• Offshore Composite cables (46km)
• Dredging of pipeline corridors 2,500,000 m3
• Cathodic protection on offshore pipelines
Construction/Pre-commissioning of 9 No. offshore Clusters (top site works):
• Steel structures & piping supports 3,600 tons
• Piping works. Pipe sizes 2” to 28”. Total welding inches 244,000” (70% prefabricated)
• Equipment installation (packages & skids) 74 No.
• Cables (power & instrumentation): 1,200km
• Field instruments installation 3,200 pieces
• Cathodic protection on piping on offshore clusters
|