Construction/Pre-commissioning of offshore Pipelines: • Offshore pipelines used for conveying oil, gas and water products. • Carbon steel pipes. Pipe sizes 4” to 28”. Total length 98km. • Offshore Fiber Optic cable (10km) • Offshore Composite cables (46km) • Dredging of pipeline corridors 2,500,000 m3 • Cathodic protection on offshore pipelines Construction/Pre-commissioning of 9 No. offshore Clusters (top site works): • Steel structures & piping supports 3,600 tons • Piping works. Pipe sizes 2” to 28”. Total welding inches 244,000” (70% prefabricated) • Equipment installation (packages & skids) 74 No. • Cables (power & instrumentation): 1,200km • Field instruments installation 3,200 pieces • Cathodic protection on piping on offshore clusters |