Work Detail |
Together with BOS Power Eurowind Energy will develop and install one of Denmark’s largest battery energy storage systems (BESS) as part of an advanced hybrid power plant. A landmark energy storage facility BOS Power will act as the system integrator delivering 45 MWh, 2h battery system that includes energy storage, inverters (PCSs), energy management system, transformers, switchgears with engineering services to the plant. Eurowind Energy will provide construction services for the plant. The facility, part of GreenLab Skive, is expected to be operational by the end of 2025, providing ancillary and frequency control services to Danish transmission system operator Energinet. This project will contribute to stabilizing the national grid while maximizing the efficiency of wind and solar power. Enhance grid flexibility and stability The GreenLab Skive solar and wind hybrid park has a capacity of 84,8 MW, with an annual production of 186.000.000 kWh per year. The integration of the 45 MWh battery energy storage system will further enhance grid flexibility and stability, ensuring seamless renewable energy integration. BOS Power’s battery energy storage system will provide fast-response power compensation, balancing fluctuations in wind and solar generation. This capability is crucial for maintaining a stable energy supply. The BESS will support grid stability by instantly releasing energy when needed, maintaining frequency stability, and preventing service disruptions. |