Subscribe     Pay Now

United Arab Emirates Procurement News Notice - 85169


Procurement News Notice

PNN 85169
Work Detail AD Ports Group (ADPORTS:ADX), an enabler of integrated trade, transport and logistics solutions, announced the inauguration of CMA Terminals Khalifa Port, a state-of-the-art, AED 3.1 billion (USD 845 million) container terminal by His Highness Sheikh Khaled bin Mohamed bin Zayed Al Nahyan, Crown Prince of Abu Dhabi and Chairman of the Abu Dhabi Executive Council. The inauguration is a major milestone in the development of Khalifa Port, AD Ports Group’s flagship port. The world-class container, ro-ro, and multipurpose port facility opened in December 2012, and in just 12 years has expanded to become one of the world’s fastest-growing, most efficient commercial ports.CMA Terminals Khalifa Port, managed by a joint venture between the CMA CGM Group’s subsidiary CMA Terminals (70%) and AD Ports Group (30%), showcases advanced port infrastructure, including automated gates and integrated systems that enhance efficiency and sustainability. The facility offers shore-power for vessels to limit emissions, several solar panels areas contributing to the energy mix of the terminal operations and includes the region’s first net zero carbon administration building, which is powered by renewable energy sources. The building won the Net Zero Building Project of the Year Award in 2022 from the MENA Green Building Awards. The addition of the CMA CGM facility increases Khalifa Port’s annual container capacity by 23% to almost 10 million TEUs (Twenty Foot Equivalent Units). The new terminal is ready for rail connectivity and will significantly enhance Khalifa Port’s position as a major gateway for the region. The design of the new facility incorporates sustainability principles into the construction which support the UAE’s wider targets for building the circular economy, recycling construction and reducing operational waste. The new facility includes eight advanced Ship to Shore (STS) cranes, and 20 Electric Rubber Tyred Gantry (e-RTG) cranes, which enhances Khalifa Port’s reputation as one of the world’s most technologically advanced commercial ports, underscoring Abu Dhabi’s role in driving the future of sustainable and smart trade. The inauguration of CMA Terminals Khalifa Port marks the completion of Phase 1 of the new terminal project for CMA CGM, with the opening of an initial quay wall of 800 metres 18.5 metres of depth, and 8 STS Cranes adding a total capacity of 1.8 million TEUs (Twenty Foot Equivalent Units) to Khalifa Port. With the opening of the new CMA CGM facility, Khalifa Port has reached a new stage as one of the region’s leading port trade hubs. Khalifa Port now extends over 6.3 km2, with 41 quay cranes, 159 yard cranes, 11.7 km of quay wall and 3.8 km of breakwater length.
Country United Arab Emirates , Asia
Industry Transportation
Entry Date 18 Dec 2024
Source https://www.saudigulfprojects.com/2024/12/ad-ports-group-inaugurates-845-million-cma-terminals-khalifa-port/

Tell us about your Product / Services,
We will Find Tenders for you