Work Detail |
Construction work on the “Capitán Vicente Almandos Almonacid” International Airport in La Rioja is progressing.
The project, which began on December 10, 2018, includes the construction of a new passenger terminal with the aim of continuing to guarantee quality services and maximum operational safety.
Aeropuertos Argentina 2000 continues to move forward with the construction of the new airport in La Rioja as planned to boost tourism and production in the province. The project, which began on December 10, 2018, includes the construction of a new passenger terminal with the aim of continuing to guarantee quality services and maximum operational safety.
The new terminal of La Rioja International Airport will have 3,600 m2 and a new VIP lounge. The installation of the cladding has already been completed and the construction of the 200-vehicle parking lot is 25% complete.
The works at Almonacid Airport are divided into three stages: terminal, parking lot and platform. The construction of the new passenger terminal will not affect the air service, since while the work is in progress, the airport will continue to operate with the existing terminal, as normal.
About the new terminal
The new terminal will have a total area of ??3,600 m2 and will be built on a single floor that will optimize passenger circulation. 1,300 m2 will be operational space, consisting of a 500 m2 public hall, a check-in area with 6 counters, a new baggage carousel and pre-boarding area of ??330 m2, an arrivals area of ??290 m2, an office space for airlines of 165 m2 and a VIP lounge of 66 m2.
The building will feature two predominant materials: stone and glass. Stone will be the local reference material, as it will be Laja La Rioja, which is composed of reddish and ochre tones. Glass will be the global reference material. Being a seismic zone, all materials will be placed under the necessary technical specifications so that this geographical condition does not damage them.
In addition, it will have a technical building and a permanent control post (covered and semi-covered area of ??700 m2). 50 m2 will be used for commercial premises and the gastronomic offer will be in two sectors, one in the hall and another in the pre-boarding area.
Finally, the works will be completed with the extension of the aircraft parking platform, which will have a surface area of ??8,000 m2 to 15,000 m2. I dont understand here if until now it was 8,000 and from now on it will be 150,000 or if it is a margin of use.
Technical details of the work
3,600 m2 of new passenger terminal
200 total parking spaces
300 m2 of operational surface area consisting of a 500 m2 public hall
6 check-in counters
330 m2 of pre-boarding area and new baggage carousel
290 m2 of arrivals area
165 m2 of office space for airlines
66 m2 of VIP lounge
50 m2 of commercial premises
Extension | IRJ3724 «NEW PASSENGER TERMINAL – PROJECT 2» OF THE «CAPITÁN VICENTE ALMANDOS ALMONACID» AIRPORT IN THE PROVINCE OF LA RIO]A
More Info Print Version
Type of Work: Architectural Works
Client: AEROPUERTOS ARGENTINA 2000 SA
Tender No: 4500350481
Location: Province of La Rioja
Opening date: 06/12/2024 at 11:00 AM
Official budget: $ 4,375,910,383.15 |