Work Detail |
Elsewedy Electric PSP announces the awarding of the project, construction of a new 110/33/13.8 kV substation for the National Aquaculture Group (NAQUA) in Allith City, located 180 km south of Jeddah.
The Project was awarded by Saudi Electricity Company (SEC).
Ccope of work includes the construction of a state-of-the-art substation, featuring 12 bays of 110kV Gas insulated Switchgear, two 110/33 kV (80/100 MVA) power transformers, two 110/13.8 kV (50/67 MVA) power transformers, LV Switchgear, protection & control systems, SAS, and a comprehensive telecommunication system. Additionally, capacitor banks, bulk materials, and carrying out civil works, HVAC, and firefighting system installations are part of the contract. |