Work Detail |
The work is located in the southern area of ??the province of Chaco, it is a road corridor that connects towns from East to West, some of them with road connections that are complicated in rainy periods, because they are made of natural or improved roads (gravel). The RPN°13-Section 2 Project consists of the construction of basic works and pavement in a total length in a rural section of 38.95 km; the East and West Accesses to Charadai urban area 2.40 km; one (1) bridge over the Tapenaga River 100 meters long; and two (2) level crossings with the Belgrano Railway tracks. It has an official budget of $6,493,353,450 and will be financed by FONPLATA. The execution of the work is based on the benefits regarding safety in terms of accident prevention, improved transportation, the possibility of better service conditions, and greater connectivity between localities, especially with the capital of the province and with the other routes of the provincial and national road structure, acquiring the same an importance of a regional nature. PROVINCIAL ROUTE No. 13. SECTION: JUNCTION WITH NATIONAL ROUTE No. 95 – JUNCTION WITH MESÓN DE FIERRO – PATCHING, FRACTURE SEALING AND ASPHALT REPAIRING Type of Work: Road Works Client: PROVINCIAL ROAD DIRECTORATE Tender No: 377/2024 Location: Chaco Province Opening date: 12/08/2024 at 11:00 AM |