The project has a 7-kilometer stretch from Merlo to Morón and is 50 meters wide, allowing for only one lane per direction. The statement detailed that the renovations sought are to increase the lane capacity to two lanes per direction, with collectors.
In addition, it was indicated that Bella Vista Avenue (Route 1003) will be part of the connection with the new Presidente Perón Highway, which is why it is necessary to make reforms to make the transfer of vehicles more flexible.
In this sense, the duplication of the road will go from Route No. 21 to the Merlo Gómez station of the Belgrano Sur railway.
Some of the details of the work:
Demolition of the current roadway.
Excavation to open a box.
Construction of a double roadway in simple concrete.
Construction of collectors in simple concrete.
Construction of paved shoulders in asphalt concrete.
Implementation of ordered traffic systems at intersections.
Adaptation of the Level Crossing over the Belgrano Sur railway tracks (Merlo Gómez Station).
Construction of platforms for public transport and placement of shelters for passengers.
Vertical signage and horizontal demarcation.
New hydraulic drainage system.
New lighting systems.
New traffic-lighted vehicular and pedestrian crossings.
EXTENSION OF PROVINCIAL ROUTE Nº 1003 – SECTION: RP N° 21 – RP N° 17 – LENGTH: 7.00 KM – MERLO AND MORÓN DISTRICTS – PROVINCE OF BUENOS AIRES, ARGENTINE REPUBLIC
Type of Work: Road Works
Client: ROAD DIRECTION
Tender No: 1/2024
Location: Province of Buenos Aires
Opening date: 10/07/2024 at 10:30 AM
Official budget: $ 9,372,868,613.55 |