Mumbai Railway Vikas Corporation (MRVC) has invited bids for major bridge construction, and various works between Borivali and Nallasopara stations in connection with the proposed fifth and sixth line in between Borivali-Virar stations of Western Railway under the Mumbai Urban Transport Project (MUTP).
The scope of work includes the construction of major bridges (Br. 66, 72 & 78), ROB at Vasai, vehicle subway (Br. 71), minor bridges (Br. 79, 79A), drain (ch: 54836 to ch: 55336) & earthwork in formation (ch: 38850 to ch: 39750 & ch: 53300 to ch: 55750) in the section.
The work is to be completed in 30 months. The contract has an estimated value of Rs 115.19 crore.
The closing date for bid submission is 19 July, 2024. |