Request For Demo     Request For FreeTrial     Subscribe     Pay Now

Vietnam Procurement News Notice - 60770


Procurement News Notice

PNN 60770
Work Detail (BDT) - On the North-South Expressway in the East, the Chi Thanh - Van Phong section, contractors are competing at the pivotal stage, demonstrating their strength to complete the project by the end of 2025. Yes Contractors show effort and endurance, but there are also contractors who need to revise their construction plans.45 construction jobs, 537 pieces of equipment and more than 1,200 workers on the project According to the report of Project Management Board 7 (Ministry of Transport), the project includes 2 construction and installation packages. In particular, Package XL01 Construction of section Km0+000 - Km24+000 (package value of 4,303 billion VND) is carried out by Deo Ca Group Joint Stock Company - Thang Long Corporation - JSC - Construction Corporation. Lung Lo Construction - Phuc Loc Group Joint Stock Company - 68 Construction Services and Trading Joint Stock Company. Package XL02 Construction of section Km24+000 - Km48+052 (package value 4,103 billion VND) by the Joint Venture of North Central South Infrastructure Construction Joint Stock Company - Construction Corporation No. 1 - Joint Stock Company (CC1) - Implementation by Central Construction Group Joint Stock Company - Tu Lap Construction Company Limited. The overall assessment of the Investor shows that the mobilization of machinery, equipment, and personnel on the construction site by the contractors basically meets the requirements with 45 construction tasks; 537 machines, equipment and 1,361 human resources. In particular, Package XL01 has mobilized 23 construction tasks with 317 machines, equipment and 699 human resources. Package XL02 mobilizes 22 construction sites with 220 machines, equipment and 662 human resources. The total output value of the Project to date has reached 2,166.38/7,557 billion VND (reaching 28.66% of the contract value, about 1.86% slower than the adjusted plan). Disbursement from the beginning of the project to date has reached 4,199/6,597.5 billion VND of the assigned capital plan (reaching 63.64%). Regarding the main construction volume, for Package XL01, the route has completed 20.87/21.95 km of public service roads (reaching 95.08%), the remaining part has not been constructed due to land problems. With weak soil treatment: wicking 1.02/5.85 km (reaching 17.43%), soil reinforced with cement 0.29/0.95 km (reaching 30.52%); foundation excavation 838,936/1,512,845 m3 (reaching 55.45%). For the tunnel part, 409/496 m of the northern tunnel has been drilled (reaching 82.46%); the South 614/1,544 m (reaching 39.77%). As for the bridge part, 15/16 bridges have been constructed, of which 300/365 bored piles have been completed (reaching 82.19%), 99/401 beam slabs have been cast (reaching 24.68%)... "In this bidding package, contractors carry out basic construction in accordance with ground conditions and sources of construction materials. Construction progress of Package XL01 is about 2.64% slower than planned", Owner Tu said. Meanwhile, for Package XL02, the route has completed 16.75/19.34 km of public service roads (reaching 86.6%). Soft soil treatment: 0.56/7.52 km permeate (reaching 7.44%), cement-reinforced soil pillars 0.37/0.96 km (reaching 38.54%); foundation excavation 750,093/1,389,000 m3 (reaching 53.99%); Road embankment 198,388/3,513,973m3 (reaching 5.64%). For the bridge part, 14/16 bridges have been constructed; Of which, 468/538 bored piles have been completed (reaching 86.99%), 384/958 beam slabs have been cast (reaching 40.58%)... "Construction progress of Package XL02 is about 1.03% slower than planned, mainly due to land problems and difficulty in material sources," Project Management Board 7 informed. Quantity will be transferred with non-responsive contractors Although the mobilization of equipment and personnel for the entire project is guaranteed, the contractor - Central Region Construction Group Joint Stock Company has not fully mobilized machinery and personnel for construction sites as planned. suggest. Also according to the Investors assessment, in Package XL02, this contractors construction has not met the requirements, the output has only reached 14.08% of the contract value, and not enough construction steps have been deployed (section Km34+ 240 - Km36+814 due to changing subcontractors, it took a lot of time for the mobilization and dissolution of subcontractors). Regarding the projects critical path, which is the treatment of soft ground, the contractors CC1, North Central South, Central Region, and Tu Lap are still slow in installing seepage wicks, sand wells, and filling sand up to the top of the floor level. sand cushion. The investor requested that the Central Construction Group Joint Stock Company urgently mobilize machinery and personnel and immediately deploy construction of the Km34+240 - Km35+500 route; In case by March 5, 2024, the unit does not meet the requirements, Project Management Board 7 will transfer the volume to another contractor in the joint venture to speed up the construction progress. Meanwhile, the scope of work for Package XL01 is still very large but the construction organization is not yet scientific. The construction contractors are not yet neat and complete with each section of the route. In particular, contractor Phuc Loc has a new output reaching 15.59% of the contract value (in addition to subjective reasons, the objective reason is due to land problems). Regarding the critical path of the project, which is the treatment of soft soil, the contractors Phuc Loc and Thuong 68 are still slow in installing permeation wicks and filling with sand to the top of the sand buffer layer. In addition, contractors Thang Long and Deo Ca also need to urgently complete the construction of sewers and underground tunnels, speed up the progress of digging and covering the roadbed, and strive to complete the roadbed work before December 30. June 2024.
Country Vietnam , South Eastern Asia
Industry Construction
Entry Date 04 Mar 2024
Source https://baodauthau.vn/nha-thau-dua-suc-tren-cao-toc-chi-thanh-van-phong-post150680.html

Tell us about your Product / Services,
We will Find Tenders for you