Work Detail |
The Vadodara Division of Western Railway in Gujarat is seeking bids for the installation of 1.151 MW grid-connected rooftop solar power projects at its stations and various locations.
The project is expected to be completed within 12 months from the issuance of the work order, with an estimated value of ?5.77 crores.
Interested parties have until February 12, 2024, to submit their bids, and the bid opening will take place on the same day. A mandatory earnest money deposit of ?438,600 is required from bidders.
The scope of work involves the supply, installation, and commissioning of grid-connected rooftop solar systems featuring mono-crystalline panels, inverters, MS hot-dipped galvanized structures, power conditioning units, junction boxes, AC and DC distribution boards, armored power and control cables, remote data monitoring systems, and net metering.
To be eligible, bidders should have completed three similar projects, each costing at least 30% of the advertised value, or two similar projects, each costing at least 40% of the advertised value, or one similar project costing not less than 60% of the advertised value within the last seven years.
Similar projects encompass the commissioning, maintenance, and repair of solar modules, solar water heaters, solar lighting systems, or solar power packs for any central or state government department or public sector undertakings.
Bidders are also required to have a minimum average annual contractual turnover, with the article ending abruptly. |