Work Detail |
The provincial government called for bids for the construction of the Level II Health Center building in Mauricio Mayer, to be carried out in that town on October 31 at 10 a.m. The work has a budget of $319,594,340 and a deadline of execution of 540 days. In this sense, the Undersecretary of Health, Gustavo Vera, expressed to the Provincial News Agency his joy at being about to realize a dream for the town. «During this last time, some work renovations were carried out, but the Health Center is already old and we needed this change. The new Center will have an area that exceeds 600 square meters, which will allow the operation of two offices for care, space for dentistry, vaccination service, diagnostic imaging, nursing room, pharmacy, waiting room, among others. others. «This work is another example of the strengthening of the Health System, where thanks to the political decision of Governor Sergio Ziliotto, health institutions are strengthened to decentralize care, favoring the expansion of local resolution capacity. “It is very good news and long awaited by the community of Mauricio Mayer,” stressed the undersecretary. . Characteristics. The building to be built for the Mauricio Mayer Level II Health Center will be located at the entrance to the town and will have a construction of 642 square meters covered and 39 semi-covered. This surface is distributed in reception and care, an administrative sector with a file, a waiting room, two offices of which one will have a bathroom, dentistry, an observation and hospitalization room with bathrooms, a nursing room, a pharmacy and common bathroom services. living rooms, kitchen and laundry room, shock room, diagnostic imaging, four technical rooms for compressed air, generator, oxygen and aspiration, and pathological waste deposit. Differentiated entrances have been planned for the vaccination center, which will have a waiting room, adapted bathroom, reception and care area. The semi-covered ones are for the ambulance garage and access to the building. |