Subscribe     Pay Now

Argentina Procurement News Notice - 40111


Procurement News Notice

PNN 40111
Work Detail Villa Devoto: tender for the enhancement and technological adaptation of Palacio Ceci The Chief of the Cabinet of Ministers of the City of Buenos Aires made a new public tender for the enhancement and technological adaptation of the Ceci Palace in Villa Devoto (Comuna 11). The official budget is $488,470,808.97. Bids will be opened on January 25. The palace belongs to the Special Education School No. 28 Dr. Bartolomé Ayrolo. Last year the educational community mobilized before the versions about the possible transfer of the property to another area of ??the Buenos Aires Government to turn it into Casa del Vino, within the framework of the Wine District that operates in Devoto and surrounding neighborhoods. The work includes the enhancement of the historic garden, including the historic party wall. The construction of a fence to section off the courtyard of the Dr. Ayrolo School. The light construction of a semi-covered annex building, which will house the water reserve tanks at the underground level. Construction of an underground room. continuous to the basement of the annex, for the installation of an Electrical Transformer Substation, to be located next to the new Electrical Meter, in accordance with the requirements of EDESUR. "The intervention project for its conservation, enhancement and technological updating, will be carried out from a comprehensive, methodical and interdisciplinary approach," says the tender document. “The progressive deterioration currently represents a threat to its intrinsic values, so it is imperative to carry out a sustained plan for the conservation and maintenance of the palace and its surroundings, with the double objective of safeguarding those values ??that have to do with its architectural characteristics. , constructive and material, as well as those that contribute to the social good and the use of the entire community”, they say in the GCBA. Regarding the functional adequacy, it is stated: “The Palace has approximately 1,150 m2 of covered surface. The new public toilets and a new office will be located in the basement with independent access on the northwest façade. The two halls will be restored, the original kitchen area of ??the building will be kept as an exhibition, as well as its annex, the original covering of ceramic pieces will be maintained, as well as the wooden and mosaic floors with guards. It has been decided not to rehabilitate the historic elevator, and in order for the building to comply with accessibility for people with reduced mobility, a new exterior elevator has been designed on the northeast façade, which runs through the three levels of the building, basement, ground floor, and first floor. floor. "The main floor raised at half level (piano nóbile) has 340 m2, it is accessed by an external staircase with two curved sections to an external access hall, the double-height main hall is crowned by a central dome, with two great rooms on both sides and a gathering room to be restored. An existing office and another on the first floor will be conditioned, as well as the existing restrooms on the First Floor and Ground Floor. The upper floor will be used mainly for training rooms and a sector of Palace Memorabilia. The second floor plan will have toilets and access to the walkable roof. The roof is technical, it is accessed through a metallic spiral staircase to be recovered. A small semi-covered annex building has been incorporated into the plot, in the park, respecting its original trees, The technological adaptation as a whole implies a complex, comprehensive and interdisciplinary project approach and materialization. Its primary task is to add value by updating structures and facilities and putting them into code, guaranteeing a relevant, safe and sustainable reuse. Actions are contemplated on the following installations: Fire systems, air conditioning installations, sanitary installations, electrical installations, lighting, electromechanical installations. It is located within APH 36 – Plaza Arenales, Estación Devoto and buffer zone – with Integral Protection. (Law 656 – year 2001) Comprehensive Protection: those buildings of special interest are affected at this level, whose historical-cultural and/or architectural value has made them urban landmarks, deserving of Comprehensive protection. It protects the entirety of each building, preserving all its architectural characteristics and forms of occupation of the space. It was declared through Law 656 Asset of Architectural Interest AWARD | TECHNOLOGICAL VALUE AND ADAPTATION PALACIO CECI Client: HEAD OF THE CABINET OF MINISTERS Place: City of Buenos Aires Opening date: 01/31/2023 1:00 p.m. Official budget: $488,470,809 See Tender Pre-awarded firm: Hit Construcciones SA Line: 1 – quantity: 1 – unit price: $564,979,488.52- total price: $564,979,488.52. More information at ObraPublica.com Fuente: ObraPublica.com
Country Argentina , South America
Industry Construction
Entry Date 18 Mar 2023
Source https://www.construar.com.ar/2023/03/villa-devoto-licitan-la-puesta-en-valor-y-adecuacion-tecnologica-del-palacio-ceci/

Tell us about your Product / Services,
We will Find Tenders for you