Work Detail |
improve the drinking water service and collection of sewage liquids for customers and neighbors facing Calle 25 de Mayo and surrounding areas, together with resurfacing based on
the technical requirements of the Municipality of the section affected by the width of the trench of the excavation if the basic work is awarded and the full width of the roadway in the project area if mandatory alternative No. 1 is awarded. This includes execution of
asphalt pavement, demarcation painting, pedestrian path and other tasks and/or works that the Municipality considers necessary for the proper functioning of the road.
Currently, the drinking water service for the area is supplied by aqueducts from the Alto Godoy Water Treatment Plant. The street to be intervened does not have large aqueducts, but it does have distribution pipes, mostly made of cast iron and
cementitious material, with minimum diameters, which have been in service for more than 25 years and present deficiencies in conduction, mainly related to corrosion and corrosion. sediment accumulation.
The existing sewage effluent collection service in the area has a tertiary network of minimum diameter, made of vitreous material that dates back more than 30 years. Most of the networks present a very advanced deterioration or their conduction capacity is
compromised.
For this reason, it is proposed to renew the tertiary distribution network of drinking water by a single PVC pipe K10 JE DN 160mm (pipe to be provided by AySAM) together with the complete renovation of the household connections of drinking water up to the metering box. and move them to the new network. Hydrants, drains and other complementary elements of the network must also be installed.
Regarding the sewage collection service, it is proposed to replace and install the tertiary network in PVC Sewage pipe DN 200mm and DN 160mm (pipes to be provided by AySAM), by road axis in the same trace of the existing collector. It must also
recondition existing manholes and renew home connections within the width of the work trench if the basic work is awarded and even outside the resurfacing area, recommending at least up to the tree line if mandatory alternative N is awarded °1.
AWARD | INTEGRAL RENOVATION OF CALLE 25 DE MAYO BETWEEN CALLE RIVADAVIA AND AV. LAS HERAS-MENDOZA
Client: WATER AND SANITATION MENDOZA SA
Place: Province of Mendoza
Opening date: 05-26-2022 2:00 p.m.
Official budget: $21,188,313.58 See Tender
-Desert- |