Work Detail |
Opening of envelopes with offers to carry out the resurfacing of provincial route No. 70, between RP No. 13 (access to Presidente Roca) and RP No. 65-s (access to Vila), in addition to the accesses to Presidente Roca, San Antonio, Castellanos, Vila and Coronel Fraga.
OFFERS
Seven bids were presented at the time: Luis Losi SA, $1,688,947,640; Rovial SA, $1,920,706,130; Rava SA de Construcciones, $1,895,850,290; Nestor Julio Guerechet SA, $1,946,483,122; Vial Agro SA, $1,765,024,765; Obring SA–Laromet SA (UT), $1,860,845,570; and Ponce Construcciones SRL, $1,864,123,646.
WORK DETAILS
The work has an official budget of $1,415,888,953 and has an execution period of 12 months to carry out the tasks in a section of 20,450 meters, on the western area of ??the 130-kilometer transversal corridor, which connects the departments of La Capital , Las Colonias and Castellanos, and has a connection with the province of Córdoba.
The project focuses on the milling of the upper layer and the removal of the concrete base, to build a new structural package composed of: a sub-base 55 centimeters deep (30 of selected soil and 25 of cal soil), a 20-centimeter granular stabilized cement base (which includes RAP and crushed concrete), a two-centimeter anti-reflective layer of asphalt sand and a six-centimeter hot asphalt concrete bearing layer.
On the other hand, the intervention contemplates the resurfacing of the 1,100-meter stretch between Presidente Roca and Presidente Roca Station. In addition, at the entrances to the Presidente Roca, San Antonio, Castellanos, Vila and Coronel Fraga stations, patching, paving, repaving, construction of sewers, horizontal signage, replacement of LED lights and painting of columns will be carried out, as appropriate .
RP Nº 70, SECTION: RP Nº 13(KM. 91+455) – RP Nº 65-S(KM. 111+906) REPAVEMENT AND IMPROVEMENT OF ACCESSES IN THE TOWNS OF PRESIDENT ROCA, SAN ANTONIO, VILA AND CORONEL FRAGA
Type of Work: Road Works
Client: PROVINCIAL ROAD DIRECTORATE
Tender No: 04/2022
Place: Province of Santa Fe
Opening date: 03/14/2022 at 11:00 AM
Official budget: $1,415,888,953.01
More information at ObraPublica.com
Source: ObraPublica.com |