Subscribe     Pay Now

Vietnam Procurement News Notice - 30996


Procurement News Notice

PNN 30996
Work Detail January 13, 2021 16:11 (CPT) - A contractor sends a response to the Bidding Newspaper stating that it does not approve the bid evaluation (Bid), contractor selection results in Package 1 Construction + Equipment under the Public Works submitted to Thua Town Secondary School (Luong Tai district, Bac Ninh province), the category of 3-floor 12-room and multi-purpose house. The Procuring Entity has eliminated the Contractor because of the Principle Contract between the Contractor v The contractor was rejected in the technical evaluation step because the in-principle contract signed with the supplier of materials and materials did not have the business code registered as rebar trading. The above package is priced at 12.8 billion dong, online contractor selection. Bidding documents (HSMT) show the technical requirements of construction materials (cement, reinforced concrete, shaped steel, bricks, tiles of all kinds, electrical supplies and equipment, water supplies and equipment. …). The level of response is pass if there is a commitment or a contract of principle with the supplier to meet the requirements. According to the Bid Evaluation Report, the Contractor is disqualified at the technical evaluation step when having a principle contract with a supplier of materials and materials, but this supplier does not have the business code registered as business. trading in reinforcement. In addition, the consulting unit assesses, the total work construction site according to the Contractors drawings and explanations does not meet the requirements. The Bidding Advisory Group said that the Contractors arrangement of scaffolding, phase reinforcement, machinery, steel processing, entrance to the security house (opposite item 4) at the project site Another implementation is unreasonable. Talking to the reporter of Bidding Newspaper, Ms. Nguyen Thi Huong, Head of Bidding Advisory Group of Thanh Cong Trading and Investment Consulting Co., Ltd. said that the Bidding Documents was built according to Form No. 01 of the Circular 04/2017 / TT-BKHDT details the selection of contractors through the electronic Government procurement system. Ms. Huong said, although the sample documents in accordance with the Circular do not have the technical requirements of construction materials, the consultant still includes this content in the Bidding Documents for the purpose of specifying evaluation criteria for Contractors ability to supply materials. If the contractor does not meet these criteria, it will be disqualified. In Document No. 106.3 / CV-Cty of Thanh Cong Construction Investment Consulting and Trading Co., Ltd to send to Thua towns Peoples Committee on response to the Contractors recommendations, the expert team for bid consideration requests the Investor / The Procuring Entity shall handle the Contractor because the Contractor signs a principal contract with the unsatisfactory unit, which is fraud in bidding. The contractor said that assessments and conclusions of the Bidding Advisory Group did not comply with the provisions of the bidding law. Bidding Documents only requires a contractor with a commitment or a principal contract with a material supplier to be qualified. On the other hand, according to the Law on Enterprises, enterprises are free to do business in industries and trades that are not prohibited by law. The raw materials and equipment supplied to the Bidding Package are not on the list of prohibited items, so the entity contracted by the Contractor is completely entitled to trade these goods. For the evaluation of the construction site organization, the Contractor explains, based on the verified drawings in the Bidding Documents. In fact, Item No. 4, the Contractor has a part of the work in this category; on the other hand, the gathering of materials and machinery is calculated by the Contractor from time to time, not once for the whole project. Therefore, construction measures are taken based on the Contractors capacity and experience and meets the requirements of the Bidding Documents. A bidding expert said that, according to Circular 04/2017 / TT-BKHDT, only evaluating the main contractors capacity, experience and technique, not evaluating the capacity, experience and technical skills of the main contractor. subcontractors, material suppliers. The principal contract is included in the Bid to demonstrate the contractors willingness to mobilize raw materials (if any). If the supplier of materials to a contractor does not have a business code registered for business, but this unit has had a contract to supply materials and materials in the past, its capacity still meets the requirements of the Bidding Documents. In case the investor wants to control whether the goods or materials are in compliance with the commitment or not, when the contractor prepares for construction, he / she will have to provide samples of the material, then there is an inspection consultant to check the whether the material is satisfactory or not.
Country Vietnam , South Eastern Asia
Industry Construction
Entry Date 17 Feb 2021
Source http://muasamcong.mpi.gov.vn/article/detail?id=p56067

Tell us about your Product / Services,
We will Find Tenders for you