Work Detail |
Bidding package uses loans from the Asian Development Bank (ADB), is competitively bidding among domestic contractors, issuing bidding documents (Bidding Documents) by two methods: direct purchase or cross-purchase. post office. The package includes the following items: sidewalk, drainage, ditch, pavement, trees and signs with a total length of more than 2 km, with a starting point at Km0 + 00 at the junction of Phung Hung road and bridge Suoi Tien (belonging to Tran Phu ward, Ha Giang city) and the ending point at Km2 + 19.06 of Phung Hung road coincides with Km1 + 984.50 of National Highway 34 (belonging to group 2, Ngoc Ha ward, Ha Giang city) ; road width 7.5 m; lighting items (LEDs, poles, cables, switchboards) with automatic system control with a capacity of 30 kVA; electrical equipment of the type of lighting with energy-saving cabinets with semiconductors and control circuits to change with a capacity of 30kVA. Contract duration is 18 months. The Management Board of the Green Category 2 Urban Development Project said that the contractor participating in the HG-CW07 Construction Package: Construction of Phung Hung Street needs to prove that it has participated in at least one contract and has completed it. The project has been completed or basically completed within the last 5 years and has the same characteristics as the bidding project, in which the participating value of the contractor is larger than VND 25.9 billion. Minimum average annual construction revenue of the contractor must be VND 43 billion, equal to the sum of payments that have been confirmed for contracts in progress or completed, within the past 3 years. According to the Bidding Document of Bid opening, during the period of issuing Bidding Documents, 14 contractors purchased HG-CW07 Construction Package document, coming from Hanoi City (7 contractors), Tuyen Quang (2 houses). Contractor), Hai Duong (1 contractor), Hai Phong (1 contractor), Yen Bai (1 contractor), Bac Ninh (1 contractor), Ha Giang (1 contractor). There are 6 contractors submitting bid dossier as prescribed: Tan Thanh Do Incoland Group Joint Stock Company (Hanoi), Ngoc Minh Construction and Trading Joint Stock Company - UDIC (Hanoi), Yen Transport Construction Joint Stock Company Bai (Yen Bai), Thanh Hung Investment and Construction Co., Ltd (Tuyen Quang), Hiep Phu Co., Ltd (Tuyen Quang), Huy Phu Joint Venture Company - Mechanical Construction Company 1 (Ha Giang). Bid prices of 6 contractors stated in the bidding application (not yet discounted) are respectively VND 31,864 billion, VND 30,068 billion, VND 24,997 billion, VND 32,441 billion, VND 32,225 billion and VND 23,037 billion. In which, 2 out of 6 bidders included Tan Thanh Do Incoland Group Joint Stock Company (down VND 2,333 billion, bidding price after discount of VND 29.53 billion), Ngoc Minh Construction and Trading Joint Stock Company - UDIC (VND 1,369 billion discount, the bid price after discount is VND 28,699 billion). Thus, the two contractors with the lowest bid price are Yen Bai Transport Construction Joint Stock Company (VND 24,997 billion), Huy Phu Joint Venture Company - Mechanical Construction Company 1 (VND 23,037 billion). The record of opening Bid dossier also records the bid status of all contractors that are sealed, including 1 original and 4 copies (attached with 1 USB); The period of validity of Bid dossier is 180 days, bidding guarantee is 450 million VND; Contract implementation period 18 months. |