Work Detail |
In both arteries works are carried out for the drainage of rainwater and the channeling of the slopes in the area, within the different planning stages of paving works On Miguel David Street, the interventions are currently extending along the section between Governor Mihura and the railroad tracks, while on Governor Faustino Parera streets, it includes between David and Governor Eduardo Tibiletti streets. And they are in charge of the Transitional Business Union (UTE) formed by the companies Paulina Castro de Demartín e Hijos SRL and OIC SA. With a sustained pace of work, in Miguel Miguel street a concrete storm drain pipe is constructed, of 1.20 meters by 2 meters. While in Governor Parera, the work front is developed with the constitution of the new chambers for the sinks, and the drainage system of the future asphalted road trace had to be expanded: due to the large number of slopes, the amount of meters to channel those underground waters. This is one of the initial stages of work planned for paving, since the new sub-base and base of the trace must be formed, the gutter cords constructed, and finally the asphaltic folder will be placed. The work tendered by the municipal government includes the paving of Miguel David Street, from Salvador Caputto Street to Governor Parera - about 300 meters from Caputto were already paved; while in Faustino Parera street, it extends between Miguel David and Governor Tibiletti. |