Subscribe     Pay Now

Vietnam Procurement News Notice - 24495


Procurement News Notice

PNN 24495
Work Detail Friday, October 25, 2019 14:00 (TDT) - Vinh Long Project Management Board of Construction Investment Projects for Agriculture and Rural Development (MARD) has just opened the online bidding package Package 1 of Construction works under the Irrigation System Project of communes : Song Phu, Phu Loc, Hau Loc, Hoa Loc and My Loc belong to Tam Binh district, Vinh Long province. The two contractors participating in this package are Vinh Loc Company Limited (Vinh Long) and Thoi Binh Construction and Trading Joint Stock Company (Ho Chi Minh City). The bidding package applies the bidding form widely, the method of one phase, two dossier bags; type of contract at a fixed unit price, with a duration of 720 days. The estimated price of the Package is VND 58,157 billion. According to the requirements of the bidding documents (Bidding Documents), each participating contractor must ensure the average annual turnover in the last 3 years of at least VND 43.5 billion; available financial resources is VND 7.26 billion. Regarding the same contract size, each contractor must have 3 contracts worth at least VND 13.3 billion each, if more or less, there must be at least 1 contract worth at least 13, 3 billion dong and the total value of contracts is 39.6 billion dong. Similar works level IV in the field of Agriculture and Rural Development. In nature and complexity, the same contract is a contract for the construction of a dyke (from 3m or more on the surface), solidification of the same dam with the bidding package under consideration and to be constructed in the Dong area. by the Mekong River. The technical proposals of both contractors Vinh Loc and Thoi Binh offer the same validity of the dossier (180 days), the validity of the bid security (210 days) and the duration of contract performance. (720 days). In terms of the number of bid packages published in the last 3 years, the two contractors are almost equivalent, ranging from 23 to 24 bidding packages. However, in terms of area, there is a difference. Most of the bidding packages that Vinh Loc has ever been awarded are carried out in Vinh Long province, including 13 packages which were invited to bid by the Vinh Long Agriculture and Rural Development Project Management Board. bid more than 161 billion. For example, a number of bidding packages such as Package 1 of Dyke combining the inland trunk road of Bao Ke Canal of Irrigation Infrastructure Project for aquaculture in Tam Binh - Long Ho (39,574 billion VND); Construction and installation package no.1 Construction and installation of items: embankment of Nga Hau canal; open sewer from Tu Dan and Ba Cho; Solidifying sluice gates of Tu Trang and Ut Inh of the Irrigation Infrastructure Project for aquaculture Hieu Thanh - Hieu Nghia - Hieu Nhon, Vung Liem District, Vinh Long Province (phase 2) ... In the last 3 years, Thoi Binh contractor has a quite diverse winning areas: Ho Chi Minh City, Ca Mau, Can Tho ... This contractor has not been announced any winning package in Vinh Long. In terms of scale, the proportion of bidding packages with winning value of over VND 20 billion accounts for more than half of the total number of bidding packages (17/24 bidding packages). The total winning bid price announced by this contractor is over VND 864 billion. For example, a number of large-scale bidding packages such as Package 27 of Construction and Upgrading of Channels and Works on Canal N46 from K0 + 000 to K4 + 060 under Dong Cu Chi Canal Irrigation System Upgrading Project , with a winning bid of 112.3 billion dong (in partnership with Hai Duong Dike Construction and Rural Development Joint Stock Company) ...
Country Vietnam , South Eastern Asia
Industry Construction
Entry Date 29 Oct 2019
Source https://baodauthau.vn/dau-thau/mo-goi-thau-xay-lap-thuy-loi-hon-58-ty-dong-tai-vinh-long-cuoc-dua-giua-2-nha-thau-113054.html

Tell us about your Product / Services,
We will Find Tenders for you