Subscribe     Pay Now

Vietnam Procurement News Notice - 24487


Procurement News Notice

PNN 24487
Work Detail Tuesday, October 22, 2019 14:00 (GDT) - On October 21, 2019, a pre-bidding conference for two construction and installation packages (No. 15 and No. 16) of the Project on Dredging the drainage axis of Xom Cui canal (Ho Chi Minh City) was organized to make Clearly some contents of the bidding documents (Bidding Documents). These are 2 very large bidding packages, attracting the attention of many contractors. The Xom Cui canal dredging project has two major construction packages. Specifically, Package 15 Construction and Installation 1 From K0 + 000 to K3 + 311, the bidding package price is 558,109,568,887 VND. Package 16 Construction and installation 2 From K3 + 311 to K6 + 650, the bidding package price is VND 554.405,803,404. Both bidding packages are funded by Ho Chi Minh City budget. The form of contractor selection is open bidding, not pre-qualification. The two above-mentioned packages are invested by Ho Chi Minh City Infrastructure Construction Project Management Unit (BMT). As planned, these two bidding packages will be opened for bidding on October 28, 2019. These are packages that attract the attention of many contractors in the field of irrigation, construction of embankments. Up to now, 16 contractors have purchased Bidding Documents of these two bidding packages. During the process of issuing Bidding Documents, the contractor sent a written request to clarify the Bidding Documents. On October 17, 2019, BMT sent a letter to bidders to buy the Bidding Documents to participate in the Pre-Bidding Conference. The conference took place in the afternoon of October 21 under the chairmanship of Mr. Tran Nhu Quoc Bao, Deputy Director of Ho Chi Minh City Urban Infrastructure Construction Project Management Board. Under the direction of BMT, consultants such as: New Technology Construction Services Trading Co., Ltd. are prepared to answer bidding issues that need clarification for participating units; The Southern Institute of Water Resources Research is preparing to answer the content that needs clarification on design. Reportedly, the content of the contractors proposal for clarifying the Bidding Documents of Package 15 relates to specific experience in construction management and implementation. Accordingly, the Contractor requests clarification of the minimum value of the similar contract; How does this value apply to partners? The contractor considers that the main item of the Package is a protective embankment (or retaining wall) with a structure of reinforced concrete piles, which is the type of revetment that is currently closed by a contractor? On October 18, 2019, in the clarifying document of Bidding Package No. 15, BMT responded to the above clarification request. According to BMT, the same minimum contract value requirement is VND 314 billion including VAT as prescribed. At the same time, BMT guides contractors based on the requirements and instructions of the Bidding Documents because the Bidding Documents have been prepared in accordance with Circular No. 03/2015 / TT-BKHDT when required for assessment of competence and experience. with the joint venture contractor. Before the opinion of the contractor that, the requirement of revetment structure is reinforced concrete piles with orientation for a specific contractor in Ho Chi Minh City, BMT said: Document of design of construction drawing and the estimate was appraised and approved by the Department of Agriculture and Rural Development of Ho Chi Minh City. Bidding dossier is made based on the size and nature of the bidding package and the entire design dossier of the bidding package (including design explanation, construction design drawings, technical instructions, explanation of organizational measures). construction) has been provided to the contractor attached to Bidding Documents ”. In addition, the consulting unit established the construction drawing design and the estimate gave an explanation on the scale and main items of the bidding package: bank protection embankments, dredging canals, trees and lighting. , railings, horizontal systems, vertical systems, landing stages. In particular, the main item is a coastal protection embankment with a length of 5,399m. There are 2 types of revetment structure, including: embankment structure with 2.061m prestressed concrete sheet piles and embankment structure with 3,388m long corner reinforced concrete structure. These two types of embankment structures have been and are being built very popular in the country, especially in Ho Chi Minh City and the Mekong Delta, said the representative of BMT.
Country Vietnam , South Eastern Asia
Industry Services
Entry Date 29 Oct 2019
Source https://baodauthau.vn/dau-thau/hoi-nghi-tien-dau-thau-2-goi-thau-hon-1100-ty-tai-tphcm-lam-ro-noi-dung-cua-hsmt-112606.html

Tell us about your Product / Services,
We will Find Tenders for you