Subscribe     Pay Now

Vietnam Procurement News Notice - 23601


Procurement News Notice

PNN 23601
Work Detail (CP) - Project Management Unit (PMU) of construction works in Ca Mau Province (the investor) has just sent an official report to the Provincial Peoples Committee on the inspection and handling of wall cracks belonging to Hospital works. Cai Nuoc General Hospital. Previously, the Bidding Newspaper had a series of articles reflecting inadequacies in the use of unburnt bricks. The construction project of Cai Nuoc General Hospital with a total investment of 371 billion VND, was started in September 2010 and completed the entire project, and put into use in December 2017. . The project consists of 15 main construction items and a number of other sub-items, most of which have been completed and put to use from 2015 and earlier. These include: Department of General Medicine, Department of Pediatrics (used since 2012), Department of Tuberculosis, Oriental Medicine - Physical Therapy, Department of Pharmacy (accepted and used since 2012), Department of Production (acceptance and use from 2015) ... Project Management Board of construction works in Ca Mau province said that the above items are put into stable use and efficient operation, reinforced concrete frame structure ensures safety. In particular, these items are made of baked clay bricks so there is no crack in the wall as reflected. Only a few gene box locations have slight cracks (in the form of birds feet), the wall has been seeped due to the long usage time, and the maintenance of the building has not been carried out yet. Particularly for Package 53, Item: Department of Examination, Administration, Emergency was executed by Nga Thuy Co., Ltd., started on June 6, 2016 and completed on December 30, 2016, using unburnt bricks (AAC Autoclave bricks provided by HASS Company based in Binh Duong Province). This item has caused cracked walls due to material contraction. After checking, the construction project management board of Ca Mau province concluded: Cracks appeared mainly at the locations adjacent to walls and columns, walls and momentum, walls and technical boxes. Seepage phenomenon only occurs at the heat slot of the building. The investor asserts that the project remains safe during use. The main structure of the building is still safe, without signs of cracking columns, momentum, or floor. Cracks only affect the aesthetics of the building. According to the Project Management Board of construction works in Ca Mau province, during the warranty period for the works, the Employer has requested the Contractor to repair and repair the extra cracks, including the repair of warranty The final order for official handover is March 2, 2018 and it has been confirmed that Cai Nuoc General Hospital has finished repairing. However, during the last time, the project has caused cracks, the investor and the construction contractor continue to fix the remaining wall cracks and leaking position in the heat gap to ensure the aesthetics of the project in time. earliest.
Country Vietnam , South Eastern Asia
Industry Construction
Entry Date 20 Sep 2019
Source https://baodauthau.vn/dau-thau/nha-thau-nai-lung-sua-cong-trinh-su-dung-gach-khong-nung-108086.html

Tell us about your Product / Services,
We will Find Tenders for you