Generators-Replacement Of Gas Engine Generator Units. The Subject Of This Procurement Is Mórhő Kft. 8060 Mór, Dózsa György Út 22/A. Guascor Bag-1350 (Gm1), Operated In April 2002, And The Jenbacher Jms 316 (Gm2) Natural Gas-Powered, Combined Cycle Generator Units (Gm2), Which Is Installed In February 2004 And Jenbacher Jms 316 (Gm2). 820 - Max. 860 Kw For Electric Gas Engine Generator Unit With Enterprise Elements In The Framework Of A Mixed Sales Contract. The Successful Tenderer Shall Take On Both Gas Engine Generator Units 12 Months From The Date Of Successful Commissioning. The Main Technical Parameters Expected Against Gas Engine Generator Units (Gm1, Gm2): - Nominal Electrical Power: Min. 820 Kw - Max. 860 Kw, - Electric Efficiency: Min. 37 %, - Energy Efficiency: Min. 75 %, - Oil Consumption: Max. 0.5 G/Kwh. Basic Tasks Of The Successful Tenderer For Gm1: - Stop Existing (Guascor) Equipment, De -Voltage, Liquids. - Demolition And Restoration Of Mixed, Complex Wall Facade Elements. - Moving Genset, Crane. - Purchase And Install A New Gens. - Removal Of Building (Trapezoidal Flat Roof). - Demolition Of Existing Table Cools. - Preparation Of Refrigerator Reception Area. - Installation Of New Table Cooler, Necessary Modification Of Pipelines (For Refrigerators). - Replacement Of Flue Gas Aligners. - Modification Of Flue Gas System As Needed. - Cleaning Of Flue Gas Heat Exchanger. - Thermal Insulation Of Flue Gas System And Heat Exchanger (Ceramic+Rock Wool). - Replacement Of Electric Cabinets (Siemens Or Equivalent Controller). - Review Of Electrical Cables (Measurement Report). - The Necessary Transformation And Renovation Of The Gas System. - Repair/Renovation Of Plate Heat Exchangers. - Repair/Renovation Of Pumps. - Repair/Renovation Of Triple Valves (With Actuator). - Deposification Of Expanded Parts (Within The Area). - Cleaning Gas Engine Space. - Conduct Licensing Processes. - Operation Test And Trial. - Max. 6 Main Management Management Max. 8 Hours (Total For Ordered Gentes). - Perform The Mandatory Maintenance Tasks Defined By The Manufacturer Up To 10,000 Hours. - Provide The Engine Oil Sampling And Test Process With The Frequency Prescribed By The Manufacturer. - Bug Fixes For The Warranty Over A 12 -Month Period. Basic Tasks Of The Successful Tenderer For Gm2: - Stop Existing, Jenbacher (Jenbacher) Equipment, Depletion Of Liquids. - Demolition And Restoration Of Facade Elements. - Demolition And Restoration Of Facade Elements. - Moving Genset, Crane. - Purchase And Install A New Gens. - Demolition Of An Existing Table Cooler. - Preparation Of Refrigerator Reception Area. - Movement Of Emergency Cooling. - A Necessary Change Of Pipelines (For Refrigerators
Contact Information
Contact No.
+36 22407315
Email
pallagr@morho.hu
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 98172165
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.