The Tasks Will Cover The Reconstruction Or Renovation Of 14 Road Sections In The Boguchwała Commune: 1) Hardening Of The Area On Plot 847/5 In Niechobrze: Hardening Of The Area With The Area 1082 M2 Will Include Works In Technology:-Demolition Doctotes-15M Curb-Building With Broken Aggregates Upper Layer 5 Cm-Mechanical Surface Profiling On The Entire Hardened Surface-Propagation Of The Surface From Broken Aggregates-Asphalt Binding Asphalt Asphalt Of 4.0 Cm-Abrasive Asphalt Yard 3.0 Cm-15 M In Place-15 M Dismantled - Increasing The Level Of Arrangement2) Reconstruction Of Ul. Syska In Boguchwale. Syska In Boguchwala Will Include The Scope Of Works In Technology:-Correction 0.35 M X 3.2M X 42.0M-Preventing And Compaction Of The Substrate-Yield 20 Cm Stabilized With Cement 2.5 Mpa With 20% Regeneration-Determination-Determination Of The Upper Floor From Broken Aggregate 15 Cm Asphalt 3.0 Cm Unilateral With Broken Aggregates 0.4 M-Leveling Of The Target Road Width 3.0M .3) Reconstruction Of The Road To Plot 1704/1 In Lutoryż. Cm-Corting 25 Cm With Export-Discs And Compaction Of The Substrate Of 15 Cm Of 2.5 Mpa Cement Stabilized With 20% Regeneration Of Aggregate From The Demolition Of The Upper Demits From The Upper Carbitege Of Broken Aggregate 15 Cm-Laying Asphalt Asphalt Asphalt. Broken Aggregates 0.3 M- Zabas From The Brush Of The Road Width 2.7 M.4) Reconstruction Of The Road To Journal Of Laws 732 In Wola Zgłobieńska. 35 M Section Of The Road At Journal Compaction Of The Substrate Of 15 Cm Of Soil Stabilized With 2.5 Mpa With 20% Regeneration With Aggregate-Upper Latch Rowudocecenowa Road Width 2.6 M.5) Reconstruction Of The Road To Journal Of Laws 369 In Wola Zgłobieńska. The Construction Of The Road 150 M Section Of The Road On Journal Mpa With 20% Rearranging With Aggregate-Upper Laity Underbuilding From A Broken Aggregate 15 Cm-Asphalt Asphalt Of 4.0 Cm Asphalt Agent. M.6) Reconstruction Of The Road To Plot 704/6 In Lutoryż. 60 Cm-Conclusion 4.0 M Of Culvert Of The Sn8 Pps Pp And 2 Resistance Walls With Resistance-Corner 25 Cm With Depletion And Compaction Of The Substrate-Yield 15 Cm Of 2.5 Mpa Cement-Stabilized Soil With 20% Aggravation With Aggregate-Upper Undercoat. Asphalt 4.0 Cm-Abrasive Asphalt Compound 3.0 Cm-Pitched With Broken Aggregates-Modification, Sewage Troughs 35X50/59X40-Reference 27M Ditch Roadside Roadside Road Width 2.5 M.7) Reconstruction Of The Road To Journal Of Laws 1498 In Boguchwale, National Connector-Ul. Łąkowa. The Collection Will Be Covered By A 105 M Section Of Road To Plot 1498 In Boguchwala In Technology:-Demolition Robots, Demolition Of A Fragment Of Bituminous Surfaces-Propagation Of The Surface From Aggregates From The Aggregate Asphalt Asphalt Of Asphalt 4.0 Cm-Abrasive Asphalt. Broken Frightening Road Width 2.5 M8) Reconstruction Of The Road To Plot 1696 And 432/7 In Lutoryż. Humus-Forming And Thickening Of The Embankment-Building Under Stabilized Cement-Underbuilding From The Broken Aggregate-Propag
Contact Information
Address
Gmina Boguchwała,Boguchwała,36-040,Podkarpackie,Pl823 - Rzeszowski
Email
m.kotula@um.boguchwala.pl
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 95948966
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.