1. The Subject Of The Order Is The Modernization Of The It Studio In The School Complex No. 2 In Dzierżoniów, At Ul. March. J. Piłsudskiego 24. 2. The Order Will Be Carried Out From External Funds As Part Of The Project Entitled Investments In The Educational Infrastructure Of Vocational Schools Run By The Dzierżoniów Poviat (Recruitment No. Feds.09.02-Ip.01-049/23). 3. The Contracting Authority Made A Report For The Construction Intention. 4. The Subject Of The Contract Includes Construction Works Related To The Modernization Of It Studio No. 22 In The Building Of The School Complex No. 2 In Dzierżoniów, At Ul. March. J. Piłsudskiego 24 Including: 1) Construction Works: - Removal Of Moisture And Damaged Plasters And Texture Layers Within The Renovated Rooms; - Replacement Of Existing Floors And Floors; - Interior Door Replacement; - Replacement Of Window Joinery With Window Sills; - Arrangement Of Renovation Plasters On The Walls (In Wet Places); - Laying Of Ordinary Cement-Lime Plasters On Other Parts Of The Walls; - Execution Of Suspended Ceilings Of Cassette; - Housing Of Part Of The Central Heating Installation From Gk Boards - Plaster Coating On Ceilings And Walls; - Lime Coat On The Walls With New Wta Plasters; - Painting The Surface Of The Walls And Ceilings; 2) Works In The Field Of Sanitary Installations; - Replacement Of Central Heating Installation (Replacement Of Radiators And Cables In Accordance With Fig. 1Is In The Executive Design); - Implementation Of The Room Ventilation Installation; - Replacement Of The Segment Of The Water Supply System Within Room 22; 3) Electrical Industry Works; - Execution Of The Internal Power Supply Line Te.Pi; - Execution Of Plug And Force Sockets; - Replacement Of Basic Lighting Installation; - Performance Of Evacuation Lighting Installation; - Execution Of A Supply System For Ventilation And Heating Devices; - Execution Of Structural Wiring Installation Along With The Development Of Necessary Active And Passive Devices; -Disposing Of Grounding Installations And Compensatory Connections; - Execution Of An It Studio Monitoring Installation; - Execution Of The Necessary Measurements And Launching Built -Up Installations. For The Purposes Of The Investment, No Need For External Connections And Installations Is Expected. 5. A Detailed Description Of The Subject Of The Contract Is Contained In Technical Documentation Constituting Annex 1 To Swz. 6. Technical Documentation Is: 1) Executive Design, 2) Technical Specification Of The Execution And Acceptance Of Works (Hereinafter: Stwior), 3) The Bill Of Quantities. 7. The Attached Bill Of Quantities Is Only Information And Auxiliary Documentation When Preparing An Offer (It Is Not A Document Constituting The Basis For The Valuation Of The Subject Of The Contract). 8. Whenever There Is An Appeal In The Technical Documentation To An Optional International Or Domestic Norm, It Should Be Understood That The Contracting Authority Allows The Balance Solutions Desc
Contact Information
Address
Powiat Dzierżoniowski,Dzierżoniów,58-200,Dolnośląskie,Pl517 - Wałbrzyski
Email
starostwo@pow.dzierzoniow.pl
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 95554515
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.