Supply And Installation Of Workplate With Galvanized Plate And Wood Structure. Af_03/2022_Ps, Siding With Metal Tile. Af_03/2024, Entry Of Electricity, Air, Three -Phase, With Built -In Box, 10 Mm2 Cable And Din 50A Circuit Breaker (Not Included The Concrete Pole). Af_07/2020_Ps, Provisional Water And Sewage Connection, Conventional Work Lease, Using Potched Running Tablets Every 2.00M - 2 Uses. Af_03/2024, Local Administration Type 1, Container Rental 2, 30 X 6, 00 M, Alt. 2, 50 M, With 1 Sanitario, For Office, Complete, Without Internal Partitions (Does Not Include Mobilization/Demobilization), Without Internal Partitions And Without Sanitary (Does Not Include Mobilization/Demobilization), For Sanitario, 4 Basins, 8 Showers, 8 Lavatorio And 1 Mictorio (Does Not Include Mobilization/Demobilization), Mechanized Cleaning Of Vegetable Layer, Vegetation And Small Trees (Trunk Diameter Less Than 0, 20 M), With Treadmill Tractor. Af_03 / 2024, Mechanized Ditch With Hydraulic Excavator (Bucket Capacity: 0, 8 M³ / Power: 111 Hp), Width Up To 2, 5 M, Depth Of 1, 5 To 3, 0 M, With Clay-Adorny Soil. Af_08/2023, Mechanized Excavation For Crowning Block Or Shoe With Backhoe (Including Excavation For Formal Placement). Af_01/2024, Mechanized Excavation For Baldrame Beam Or Shoe Running With Mini-Slave (Including Excavation For Formal Placement). Af_01/2024, Preparation Of Ditch Background With Width Greater Than Or Equal To 1, 5 M And Less Than 2, 5 M (Natural Soil Hit). Af_08/2020, Mechanized Backhoe With Backhoe (Retro Bucket Capacity: 0, 26 M³/Power: 88 Hp), Width 0, 8 To 1, Depth 1, With 1St Category Soil And Percussion Soil Compactor. Af_08 / 2023, Mechanized Ditch With Backhoe Ditch (Retro Bucket Capacity: 0, 26 M³ / Power: 88 Hp), Width Up To 1, Depth Up To 1, Open -Air Pipe, 70Cm Stem Diameter, Manual Excavation, Without Base Enlargement, Concrete Made Of Work And Released With Jerica. Af_05/2020_Pa, Open -Air Pipe Base Widening, Concrete Made On Work And Launched With Jerica. Af_05/2020, Skinny Concrete Ballast, Applied To Crown Blocks Or Shoes, 5 Cm Thickness. Af_01/2024, Shoe Concreting, Fck 30 Mpa, With Pump Use - Launch, Densification And Finishing. Af_01/2024, Manufacture, Assembly And Disassembly Of Crown Block, Sawed Wood, And = 25 Mm, 4 Uses. Af_01/2024, Isolated Shoe Frame, Baldrame Beam And Shoe Running Using 8 Mm Ca -50 Steel - Assembly. Af_01/2024, Baldrame Beam And Shoe Running Using 10 Mm Ca -50 Steel - Assembly. Af_01/2024, Frame Of Different Reinforced Concrete Structures, Except Beams, Pillars, Slabs And Foundations, Using 5, 0 Mm - Assembly Ca -60 Steel. Af_06/2022, Concreting Of Crowning Block Or Baldrame Beam, Block Frame Using 10 Mm Ca -50 Steel - Assembly. Af_01/2024, Block Frame Using 6, 3 Mm - Assembly Ca -50 Steel. Af_01/2024, Block Frame Using 5 Mm Ca -60 Steel - Assembly. Af_01/2024, Block Frame, Isolated Shoe, Baldrame Beam And Running Shoe Using 12, 5 Mm Ca -50 Steel - Assembly. Af_01/2024, Baldrame Beam And Shoe Running Using 16 Mm Ca -50 Steel - Assembly. Af_01/2024, Isolated Shoe And Running Shoe Using 20 Mm Ca -50 Steel - Assembly. Af_01/2024, Mounting And Disassembly Of Rectangular Pillars And Es
|