Architectural, Engineering And Planning Services - Measure B52he156020003, Technical University Of Nuremberg (Utn), New Founding Building, 3. Tbm, Department Qe, Bnb Coordinator. The New Technical University Of Nuremberg (Utn) Will Be Built On An Approximately 37 Hectare Area In The South Of Nuremberg. The 1St Stage Of The Utn, The So -Called 5 Founding Buildings (Ggb), Is Divided Into 3 Sub -Construction Measures (Tbm). The 3Rd Tbm Is The New Construction Of The Quantum Engineering (Qe), A Laboratory Building With Approx. 1880 Sqm2 Usable Space. A General Planner For The Performance Phases 2 To 9 Is Commissioned For The Building Performance Of The Building. Services Are In Particular: Building Planning (Including Fire Protection Planning And Energy Planning Services), Structural Engineering, Technical Equipment Hls And Elt, Laboratory Planning, Building Physics, As Well As Services For Bnb Certification `Silver And Bim Coordination. It Is Very Important To The Runway To Be Able To Transport The Image Of The Innovative, Climate -Conscious And Sustainable University Via Materiality, Construction And Design Of The Building. The Founding Buildings With A Usage Area (Nuf 1-6) Of 17,700 M² Are Divided Into Three Sub-Construction Measures (Tbm) With 5 Individual Buildings And The Total Costs (Kg 200-600) Are Approximately € 103.6 Million. The Development Measure Ensures The Infra-Structural And Supply-Technical Functionality Of The Ggb And At The Same Time Forms The Overturning Of The Entire First Stage Of Development And Connecting To The Public. Transport Network. In Addition, The Em1 Will Deal With All Approval Law. In Addition To Space Measures (Terrain, Supply/Routes), Central Facilities For Supply And Disposal (Including Parking Garage, And An Energy Center With A Control Station And Logistics Center) As Well As The Routes Of The Supply Media Are To Be Realized. The 3Rd Part -Time Construction Of The Ggb Is The New Construction Of The Quqntum Engineering Department (Qe). The Building Of The Building Comprises Approx. 1,883M2 Usable Area (1-7) And Shows Different Functions: Approx. 824 M2 Laboratory Area (For E.G. Experimental Physics, Chemistry, Electrical Engineering, Optics, Measurement Technology, And Microscopy, With The Necessary Adjoining Rooms), As Well As Office Space For Professors And Staff, Project Work Rooms For Students And Meeting Rooms. In The Department Of Quantum Engineering, The Inter-Disciplinary Interaction Of The Classic Above-Mentioned Laboratory Services Is To Be Implemented. In Cooperation With Other Departments, It Will Be Possible At The Tu Nuremberg To Cover The Following Scale Areas Of Engineering: Classic Macroscale, Microtechnology, Nano Technology And Biological Mechatronics. The Advertised Performance View Of The Bnb Coordinator Includes Subsequent Positions:-Participation In The Basic Determination Such As Implementation Of A Start Workshop, Bnb Sustainable Kis Ratings With Reporting, Etc.-Participation In The Design Planning Such As Carrying Out Bnb-Precheck With Evaluation Reports And Creating A Sustainability Duty, Etc. - Participation In The Execution Planning Such As Planning Tests, Request And Compilation Of The Required Documents, F
|