1. The Subject Of The Contract Consists In Completing The Construction Works Entitled Reconstruction And Renovation Of The Communal Access Road To Agricultural Land In Warsaw In The Sławno Commune, In Accordance With The Provisions Of The Construction Law And Executive Ordinances. 2. The Subject Of The Contract Is Determined By The Construction And Executive Design Documentation Attached To Sw The Scope Of The Study Is A 770 -Meter Road Section. 4. The Project Provides, Among Others::) Reconstruction And Renovation Of The Road With Field Stone Surface To Asphalt; B) Construction Of Conventions; C) Construction Of The Roadsides; D) Ordering And Profiling The Area. 5. Comments On The Order: 1) The Designed Exits In Accordance With The Land Development Project Should Be Made Of Stone From The Demolition Of The Road. Stone And Granite Curbs From Demolition Will Transfer The Contractor To The Contracting Authority And Transport To Pszok In Warsaw. 2) Corrheting Material The Contractor Must Be Used On His Own. 6. A Detailed Description And Material Scope Of Construction Works Are Presented In The Design Documentation: 1) Construction And Executive Design, 2) Technical Specifications For The Execution And Acceptance Of Construction Works. These Assistants Should Be Used To Prepare An Offer Cost Estimate And Material -Financial Statements (Annex 8 To The Contract). The Works Of Works Attached To The Documentation Are Aid, They Are Not The Basis For The Valuation Of Works By The Contractor. The Basis For The Valuation Should Be Considered A Construction And Executive Project, Technical Specifications For The Execution And Acceptance Of Construction Works, As Well As The Comments Contained In Swz. The Landlisher Reserves That The Departments Of The Offer Cost Estimate Prepared By The Contractor Should Correspond To The Departments Of The Material And Financial Schedule Constituting The Attachment No. 8 To The Contract. Complex Design Documentation Is Attached To The Procedure. 7 The Contractor Will Develop A Project And Introduce A Temporary Traffic Organization. 8. Carrying Out Works At The Construction Site: 1) For The Way The Contractor Is Responsible, The Construction Manager Will Be Appointed By Him. 2) The Contractor Is Obliged To Prepare And Submit To The Contracting Authority Of The Work Schedule. 9. Other Requirements Of The Employer Towards The Contractor As Part Of The Established Remuneration: 1) During The Work, The Contractor Must Ensure The Passage Of The Road And Access To The Property Adjacent To The Designed Road. 2) The Contractor Will Use The Troughing Of The Corrosion On His Own Scope 3) Before Building The Products, The Contractor Is Obliged To Apply For The Approval Of The Product And Obtain Acceptance Of Investors Supervision On The Material (The Model Of The Application Will Be Developed By The Contractor In Consultation With The Investors Supervision Inspector) .4). Will Eliminate The Construction Site At Its Own Expense And Lead
Contact Information
Address
Gmina Sławno,Sławno,76-100,Zachodniopomorskie,Pl426 - Koszaliński
Contact No.
+48598107526
Email
sekretariat@gminaslawno.pl
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 95354275
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.