Establishment Of Canals And Dams With Birchalovs Excavators With 0.65 (0.5-0.8) M3 Of The Chalovs Capacity, Group Of Group: 3 (Cleaning From The Lil And Kolkos), Ozuboshal Car Kamaz 66115, 2011 15T Transportation Distance - 1 Km. 1St-Grade Load, Fulfillment Of Work On The Ground In The Soil, Group Of Group: 2-3, Excavators With 0.65 (0.5-1) M3 Of The Chain, Gas-In-Law From The Excavators To Be Drilled By Loading The Group: 3 (Ground For Cast), Mouse-Shopping Car Kamaz 66115, 2011 15T Transportation Distance - 4 Km. 1St-Grade Load, Construction Of Dams, Dams, Cuts Of The Shields Of The Screens And Dry Cubes By The Construction Of The Underground, Massacre With 16 T) (Quality Compression), Establishment Of Channels And Dams With Birchalov Excavators With 0.65 (0.0.8) M3, Group Of Group: 3 (Drilling The Cut Of The Channel), Manual Planning Of The Bottom And Slopes Of Channels Drilled, Group Of Group: 3, Fastening Of The Bottom And Slopes With Monolithic Reinforced Concrete With 16 T-Luced Cranes, Thickness Of The Hardness: 0.2 M (B15, W4, F50), Closing Of Seams In The Fastening Of The Slopes Of The Slopes Of The Cannons: With Hot Bitumen-Polymer Mastic, Cement Solution, 75 Branded, The Capacity Of The Clique Was Drilled By Reflective With 0.65 (0.5-1) M3 And Drilling The Ground By Draglayn, Group: 3, Manually Drilling The Width In Trenches To 2 M, In Trenches To 2 M, Drilling Of The Ground To The Distance From 10 M, Bulldozers Power: 96 (130) Kw (A.G.), Group 2 Group (Construction Site Cleaning), Filling Of Pits And Trenches By Changing The Ground To The Ground Up To 5 M, The Power Of Bulldozers: 96 (130) Kw (A.G.), Group 2 Ground
|