Roof -Covering Work - Kita At The Hochgericht - New Construction Of A Daycare Center. Settlement And Roofing Work: - Bitumen - Steam Barrier Approx. 2,720 M²; - Bitumen - Roof Seal, 2 -Layer Approx. 1,682 M²; - Liquid Seal, Rising Components Approx. 338.50 M; - Basic And Precise Insulation, Eps Proportionate Pure/Pir Approx. 1,508 M²; - Freefeiegelgullys Vertically, Unmounted/Insulated, Dn70 Approx. 16 Pieces; - Atticagullys For Emergency Drainage, 120/60 Mm Approx. 7 Pieces; - Sanitary Fan And Pipe Implementations Approx. 13 Pieces Of Extensive Green Roof: - Green Roof, Proportionate With Retention Approx. 1,071 M²; - Gravel Area With Aluminum Gravel Trap Bar Approx. 138 M²; - Solar Exposure Change Approx. 264 Pcs. Flat Roof Exit: - Flat Roof Skating 150/100 Cm With Scissor Staircase Approx. 1 Pc. Plant Beds: - Plant Bed 200 - 250/100/H. 40-50 Cm, Aluminum Approx. 5 Pieces; - Pour Plant Bed To Substrate Layer Approx. 4 Pieces Of Balcony And Roof Terrace - Top: - Facade Channel 130 Mm With Front Wall Approx. 58 M; - Concrete Works Stones 40/60 Cm On The Staling Bearing Approx. 250 M²; - Building Protection Plate, 1-Layer Approx. 270 M². Spengler Work: - Attica Cover, Aluminum With Edge Plane Approx. 308 M; - Window Sills, Aluminum With Edge Plane Approx. 58 M. Rainfall Lines: - Rainfall Line, Titanium Zinc, Dn7 Approx. 6 M; - Rainfall Line, Pe-Dh, Dn70 Approx. 30 M With Electronic White Sleeve. Security System: - Stainless Steel Stop Point, 16 - 42 Mm Approx. 19 Pieces; - Stainless Steel Rope, 6 Mm Approx. 150 M. Characteristics: - Gross Floor Area Approx. 2,160 M²; - Floor Height 3.90 M. Description Of The Building: The Construction Project Is A Two-Storey New Building With A Single-Storey Cultivation For A 7-Group Daycare Center. The Two -Storey Building Seal With A Flat Roof Has An Escape Balcony With An Outdoor Staircon, Parallel To The Western Facade. The Single -Storey, Cubic Cultivation Is Located On The North Side Of The Building. The Flat Roof Of The Extension Is A Roof Terrace, Also With An Outdoor Staircase On The Outer Area. Supporting Construction: The Massive Support System Is A Mixed Construction Made Of Reinforced Concrete And Masonry. Band Slab, Floor Ceiling And Roofing, As Well As The Static -Necessary Supports Are Made Of Reinforced Concrete. The Load-Bearing Indoor And Outer Walls Are Made Of Reinforced Concrete And Ks Masonry. Roofs: The Main Roof Is A Flat Roof With Extensive Green Roof And Large -Scale Photovoltaic System. The Roof Of The Cultivation Is Also A Flat Roof With Extensive Green Roof And Roof Terrace Area On Stalks. Outside Walls / Facade: The Load-Bearing Outer Walls Are Made Of Reinforced Concrete Or Lime Sandstone With Facades Made Of Clinker Straps On Etics Or Vertical Wood Battens On Miwo Insulation. The Walls Are Plastered On The Side. Inner Walls / Coverings: Load -Bearing Interior Walls Are Carried Out And Plastered According To The Static Requirements. The Non-Carrying Interior Walls Are Manufactured As Metal Stand Walls With Plasterboard Plan Or Ks Masonry. Haubetechnik: The Building Is Then Connected To The Suppliers District Heating Network. The Handover Station Is Located In The House Connection Shaft Of The Building
Contact Information
Address
Hessen-Homburg-Platz 5
Contact No.
000
Email
hanau-ibm@hanau.de
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 94994447
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.