Part 1: Development Of The Tourist Area In Piotrowice In The Scope Of Part 1: Development Of The Tourist Area In Piotrowice. Area Powered From Renewable Energy (Autonomous Solar Lamps) 5) New Plantings And Arrangements Of Greenery Of Native Species, Requirements, Requirements And Conditions For The Performance Of Works Covered By The Contract In Question, Were Specified In Executive Projects, Daily Works And Technical Specifications For The Performance And Acceptance Of Construction Works, Which Are Attached To This Swz. The Contractors Obligations Under The Offer And Offer Price Include: 1) The Performance Of The Subject Of The Contract In Accordance With The Project Documentation, Construction Art And The Principles Of Technical Knowledge, Applicable Standards And The Provisions Of The Construction Law, On The Conditions Set Out In This Agreement, And With Due Care And On Contractual Terms; 2) The Contractor Is Responsible For Full Control Of The Works And Quality Of The Materials. The Contractor Will Provide An Appropriate Control System, Including Staff, Laboratory, Equipment, Supply And All Devices Necessary To Take Samples And Materials Of Materials And Works; 3) Submission Before Signing The Contract Of A Copy Of The Building Of The Construction Manager In A Construction And Construction Specialty Or Corresponding To Them Equivalent Building Qualifications Issued On The Basis Of Previously Applicable Provisions, And In The Case Of Foreign Contractors - Construction Rights For Equivalent Management Above Indicated. Caring For The Natural Environment, Including That Waste, Emissions And Pollution From The Construction Site, In Particular Sewage, Dust, Fumes And Noise Were As Low As Possible And Did Not Exceed The Permissible Laws And Did Not Pose A Threat To The Natural Environment; 9) Ordering The Area After The End Of The Works; 10) Repair With Their Administrators; 11) The Contractors Obligations Include Full Geodetic Service Together With The As -Built Inventory Of The Subject Of The Contract. The Contracting Authority Has The Right To Demand A Current Inventory At Every Stage Of The Works. Approved Inventories Should Be Submitted In Two Copies In The Paper Version And In One Copy In An Electronic Version Saved In The Editable Form. 12) Incurring All Costs Related To The Contractor Fulfilling The Obligations Arising From This Contract; 13) Developing And Transferring To The Contracting Authority The Receipt Of The Receipt, Submitting To The Contracting Authority Readiness For Receipt14) The Contractor Will Provide. Reception:- Completed Construction Logs- Certificates, Declarations Of Conformity, Approvals For Built-In Materials,- As-Built Cost Estimates- As-Built Inventories. The Removal Requires At Least 36 Months Warranty For The Subject Of The Contract And At Least 36 Monthly Warranty. The Works Can Be Used Only Materials And Devices Corresponding To The Following Requirements: A) An Assessment Was Made In Accordance With The Harmoni
Contact Information
Address
Gmina Strzyżewice,Strzyżewice,23-107,Lubelskie,Pl814 - Lubelski
Contact No.
+48815666025
Email
zamowienia@strzyzewice.lubelskie.pl
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 94970372
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.