Quotation are invited for High Pressure Hydro-Jet Clean 1032501501 High Pressure Hydro-jet cleaning of Stage2,4<(>&<)>6 Tubes of Desal E1 at E-Station 1 ITEM-00001 HIGH PRESSURE HYDRO-JET CLEANING OF STAGE#2,4&6 TUBES OF DESAL E1 ATE-STATIONSTAGE NO. TO BE CLEANED: 2,4&6 (TOTAL STAGES: 3)TOT AL NO. OF TUBES TO BE CLEANED: 8340 NOS.SPECIFICATIONS & DETAILS OF TUBESSTAGE# 2,4&6TOTAL STAGES 3 NOS.NO. OF TUBES /STAGE 2780 NOSTOTAL TUBES IN 3 STAGES 8340 NOSTUBE DIA. 31.75 MMTUBE THICKNESS 1.00 MMTUBE MATERIAL CU NI 90/10LENGTH OF TUBES 18 MSCOPE OF WORK1.#INTERNAL SURFACE OF THE TUBES TO BE CLEANED AT APPROX. 1000 BARPRESSURE.2.#DIESEL FUEL FOR THE HIGH-PRESSURE PUMPS IS IN SCOPE OF CONTRACTOR.3.#DEWA WILL PROVIDE SCAFFOLDING, FOR KLIFT AND CRANES REQUIRED FOR THEJOB.4.#POWER AND WATER SUPPLY AT A CENTRAL POINT WILL BE PROVIDED BY DEWAFREE OF COST. CONTRACTOR SHALL ARRANGE TO EXTEND THE FACILITY TO THELOCATION WHERE IT IS REQUIRED; HOWEVER, CONTRACTOR WILL ARRANGENECESSARY EQUIPMENT/FITTING S LIKE ELECTRICAL SWITCHES, CABLES, ETC.5.#24 VOLT TRANSFORMER, CABLES AND BULBS TO BE ARRANGED BY CONTRACTOR.6.#CONTRACTOR SHALL CO MPLETE THE WORK ON TIME.7.#SAFETY OF THE STAFF INVOLVED IS THE RESPONSIBILITY OF THECONTRACTOR. ALL PPE & SAFETY HARNESS REQUIRED FO R HIS STAFF TO BEARRANGED BY CONTRACTOR.10.#ALL EQUIPMENT AND TOOLS REQUIRED FOR THE JOB IS IN SCOPE OFCONTRACTOR.11.#DISPOSAL OF TH E WASTE FROM THE SITE AFTER COMPLETION OF WORK IS THERESPONSIBILITY OF CONTRACTOR.NOTE:1.#THE CONTRACTOR SHALL VISIT THE SITE AND MA KE HIMSELF FULLY FAMILIARWITH THE WORK SCOPE, PLANT ACCESS, FACILITIES, COMPLEXITIES, ETC, BEFORESUBMITTING HIS BID DEWA WILL NOT A CCEPT ANY CLAIM FOR EXTRAS BEYOND THEORDER RATE/PRICE DURING AND AFTER THE EXECUTION OF WORK.2.#THE CONTRACTOR SHOULD OBTAIN PERMIT IN THE PRESCRIBED DEWA FORMATFOR EXTENDED HOURS OR HOLIDAYS FOR WORK.3.#CONTRACTOR WILL OBTAIN PERMISSION TO WORK (PTW) PRIOR TOMOBI LIZATION/ COMMENCEMENT OF WORK.4.#CONTRACTOR MIGHT HAVE TO MOBILIZE DOUBLE WORK FORCE TO COMPLETE THEJOB ON TIME.5.#IN CASE OF ANY E MERGENCIES THE CONTRACTOR HAS TO WORK ROUND THECLOCK TILL COMPLETION OF THE WORK.6.#IT IS ALSO LIKELY THAT WORK AT SITE MAY HAVE TO BE TEMPORARILYSUSPENDED OR POSTPONED DUE TO SYSTEM REQUIREMENTS. CONTRACTOR SHALL NOTBE LIABLE FOR ANY EXTRA COMPENSATION IN CASE OF SUCH CHANGES IN THESCHEDULES.7.#FOR ANY FURTHER CLARIFICATIONS, STATION 2.780 EA MAINTENANCE DEWA ENGINEERMR. MAJID ALRAIS CAN BE CONTACTED @ 0502566262/ MAJID.ALRAIS@DEWA.GOV.AERESPECTIVELY. 2 ITEM-00001 HIGH PRESSURE HYDRO-JET CLEANING OF STAGE#2,4&6 TUBES OF DESAL E1 ATE-STATIONSTAGE NO. TO BE CLEANED: 2,4&6 (TOTAL STAGES: 3)TOT AL NO. OF TUBES TO BE CLEANED: 8340 NOS.SPECIFICATIONS & DETAILS OF TUBESSTAGE# 2,4&6TOTAL STAGES 3 NOS.NO. OF TUBES /STAGE 2780 NOSTOTAL TUBES IN 3 STAGES 8340 NOSTUBE DIA. 31.75 MMTUBE THICKNESS 1.00 MMTUBE MATERIAL CU NI 90/10LENGTH OF TUBES 18 MSCOPE OF WORK1.#INTERNAL SURFACE OF THE TUBES TO BE CLEANED AT APPROX. 1000 BARPRESSURE.2.#DIESEL FUEL FOR THE HIGH-PRESSURE PUMPS IS IN SCOPE OF CONTRACTOR.3.#DEWA WILL PROVIDE SCAFFOLDING, FOR 2.780 EA KLIFT AND CRANES REQUIRED FOR THEJOB.4.#POWER AND WATER SUPPLY AT A CENTRAL POINT WILL BE PROVIDED BY DEWAFREE OF COST. CONTRACTOR S HALL ARRANGE TO EXTEND THE FACILITY TO THELOCATION WHERE IT IS REQUIRED; HOWEVER, CONTRACTOR WILL ARRANGENECESSARY EQUIPMENT/FITTING S LIKE ELECTRICAL SWITCHES, CABLES, ETC.5.#24 VOLT TRANSFORMER, CABLES AND BULBS TO BE ARRANGED BY CONTRACTOR.6.#CONTRACTOR SHALL CO MPLETE THE WORK ON TIME.7.#SAFETY OF THE STAFF INVOLVED IS THE RESPONSIBILITY OF THECONTRACTOR. ALL PPE & SAFETY HARNESS REQUIRED FO R HIS STAFF TO BEARRANGED BY CONTRACTOR.10.#ALL EQUIPMENT AND TOOLS REQUIRED FOR THE JOB IS IN SCOPE OFCONTRACTOR.11.#DISPOSAL OF TH E WASTE FROM THE SITE AFTER COMPLETION OF WORK IS THERESPONSIBILITY OF CONTRACTOR.NOTE:1.#THE CONTRACTOR SHALL VISIT THE SITE AND MA KE HIMSELF FULLY FAMILIARWITH THE WORK SCOPE, PLANT ACCESS, FACILITIES, COMPLEXITIES, ETC, BEFORESUBMITTING HIS BID. DEWA WILL NOT A CCEPT ANY CLAIM FOR EXTRAS BEYOND THEORDER RATE/PRICE DURING AND AFTER THE EXECUTION OF WORK.2.#THE CONTRACTOR SHOULD OBTAIN PERMIT IN THE PRESCRIBED DEWA FORMATFOR EXTENDED HOURS OR HOLIDAYS FOR WORK.3.#CONTRACTOR WILL OBTAIN PERMISSION TO WORK (PTW) PRIOR TOMOBI LIZATION/ COMMENCEMENT OF WORK.4.#CONTRACTOR MIGHT HAVE TO MOBILIZE DOUBLE WORK FORCE TO COMPLETE THEJOB ON TIME.5.#IN CASE OF ANY E MERGENCIES THE CONTRACTOR HAS TO WORK ROUND THECLOCK TILL COMPLETION OF THE WORK.6.#IT IS ALSO LIKELY THAT WORK AT SITE MAY HAVE TO BE TEMPORARILYSUSPENDED OR POSTPONED DUE TO SYSTEM REQUIREMENTS. CONTRACTOR SHALL NOTBE LIABLE FOR ANY EXTRA COMPENSATION IN CASE OF SUCH CHANGES IN THESCHEDULES.7.#FOR ANY FURTHER CLARIFICATIONS, STATION MAINTENANCE DEWA ENGINEERMR. MAJID ALRAIS CAN BE CONTACTED @ 0502566262/ MAJID.ALRAIS@DEWA.GOV.AERESPECTIVELY. 3 ITEM-00001 HIGH PRESSURE HYDRO-JET CLEANING OF STAGE#2,4&6 TUBES OF DESAL E1 ATE-STATIONSTAGE NO. TO BE CLEANED: 2,4&6 (TOTAL STAGES: 3)TOT AL NO. OF TUBES TO BE CLEANED: 8340 NOS.SPECIFICATIONS & DETAILS OF TUBESSTAGE# 2,4&6TOTAL STAGES 3 NOS.NO. OF TUBES /STAGE 2780 NOSTOTAL TUBES IN 3 STAGES 8340 NOSTUBE DIA. 31.75 MMTUBE THICKNESS 1.00 MMTUBE MATERIAL CU NI 90/10LENGTH OF TUBES 18 MSCOPE OF WORK1.#INTERNAL SURFACE OF THE TUBES TO BE CLEANED AT 2.780 EA STANDARD TERMS & CONDITIONS 1) Prices should be DDP delivery duty paid at DEWA stores. 2) Quotation to be submitted only in local currency U.A.E Dirhams 3) DEWA Standard payment terms is 30 days credit from the date of acceptance of material 4) No DEWA staff or his or her relatives up to third degree should have ownership or partnership in your company, and your participation in DEWA tenders / RFQs should not constitute a Conflict or perceived Conflict of Interest. Supplier Registration: https://srm.dewa.gov.ae/irj/portal/anonymous/regis Tender Link : https://srm.dewa.gov.ae/sap/opu/odata/sap/ZSRM_RFX_REG_BID_SRV/AttachmentSet(2332500856)/$value
|