1. The Subject Of The Contract Are Construction Works Involving The Modernization Of The Water Intake In Wólka Starzyńska. 2. In The Area Covered By The Investment, There Is A Water Supply Station Used So Far, Which Includes: Two Deep Wells: One In A Prefabricated Housing, The Other - Without A Housing In An Existing Technological Building, A Technological Building Intended For Demolition, Four Universal Tanks Of Clean Water, Two Technological Chambers, Trash, Between Objective Water Supply, Sewage And Sewage Installations Electricity. The Facility Is Fenced - An Existing Steel Mesh Fence On Steel Posts, With A 4.5 M Width Double -Leaf Gate. The Existing Weapons On The Investment Site Are Partly Intended For Initency. The Facility Has Access To A Public Road With An Existing Congress. The Adventure Of Groundwater In Wólka Starzyńska Consists Of Two Wells. The Intake Has Approved Operational Resources By The Decision Of The Częstochowa Voivode Of 05.11.1982. Sign Og.Iii.8530/27/82 In An Amount Of 56.0 M3/H At S = 13.0 M. Zamawieczny Has A Water Permit For The Intake Of Groundwater For The Purposes Of Supplying The Water Of The Population And Public Utilities Of 06.03.2024. Daily Water Production From The Intake In Wólka Starzyńska Is From 170 M3 To 240 M3. The Following Towns Are Powered From The Shot: Starzyny, Wólka Starzyńska, Przyłęk, Bogdał, Brzostek, And Szczekociny. The Administrator Of The Shot Is The Municipal Budgetary Department In Szczekociny. 3. The Scope Of The Order Includes In Particular: 1) The Construction Of A Technological Building Of A Steel Water Pumping Station With Filling System Facade Panels; 2) Building The Building With Technological Devices; 3) Modernization Of Two Steel Ground Tanks Of Pure Water With A Capacity Of 70 M3 Each By Replacing The Insulation And Covering; 4) Construction Of A Tight Tank For Sewage With A Capacity Of 2M3; Airtight For Sanitary Sewage; 6) Construction Of Water Supply And Sewage Cables Between Object-Oriented; 7) Laying Of Energy And Civil Cables; 8) Construction Of A Water Supply Cable Connecting The Water Pumping Plant With An Existing Water Supply Network; 9) Arming Of Deep Wells-2 Kpl. Partial Replacement Of The Fence And Entrance Gate; 12) Making A New Cover Of Thermoscal Felt On The Existing S1 Well Chamber And A Chamber In The Area Of Expansion Tanks; 13) Demolition Of The Existing Water Supply Station Building, Trash, Two Steel Reservoirs With A Capacity Approx. 70 M3 Each And The Existing Hardening Of The Area. 4. Performing Construction Works And Any Works Related To The Implementation Of The Subject Of The Contract May Not Cause Water Breaks. If Necessary, The Employer Allows Water Breaks. A One -Time Water Supply Break, However, Cannot Last Longer Than 6 Hours. The Employer And Administrator Should Be Notified Of The Expected Periods Of Exclusion Within At Least 3 Business Days In Advance To Agree On The Action Plan With The Administrator. After Agreement, The Administrator Will
Contact Information
Address
Gmina Szczekociny,Szczekociny,42-445,Śląskie,Pl22b - Sosnowiecki
Email
zamowienia@szczekociny.pl
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 94774607
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.