Engineering Services - Vgv Specialist Planning Tga (Elektro) - New Fire Brigade And Rescue Location Walldorf. The City Of Walldorf Intends To Develop A New Fire And Rescue Location With A New Building For The Fire Brigade In Walldorf. The Existing Fire Station In The City Area No Longer Meets The Requirements. The Construction Of The New Fire Station Is To Be Further Developed By The Local, Community -Oriented Security Structure Close To Home. At The New Overall Location South Of The Cemetery With The Construction Of The Fire Brigade, New Rooms For The Drk Local Association And An Extended Drk Emergency Doctor Location, The Area On The Grounds Of The Old Tobacco Barn South Of The Cemetery In Walldorf Is To Be Reorganized And Use With Optimized Space Cuts For The Rescue And Aid Forces. The Location, Where The Existing Drk Notarz Site Is Currently Also Located, Was Chosen As Part Of Location Examinations For Tactical And Urban Planning Reasons And Is To Be Re-Established Overall Functional And Qualitatively. /// The Aim Is To Lay The Basis For Urban Development In This Area And To Realize A Contemporary And Future -Proof Fire Department, Which In The Long Term Is Intended To Secure The Functionality Of The Facilities In Their Tasks For Walldorf. /// The Peculiarity Of The Task Lies In The Urban Integration Of The Different Functions Taking Into Account The Time Development With Different Realization Times In The Area South Of The Cemetery. With Its Location At The Motorway Junction To The A5 And The B291, The Area Forms The Western “Start” Of The City Of Walldorf And Thus Has A High Perceptibility Of Three Sides (From South, West And East). The Area To Be Developed With The Building Ensemble Is Important And Formative Due To The High Visibility And Forms The Business Card Of The City Of Walldorf In The West. /// Indoor Clima: It Is Important To The Expected Interior Quality. In Particular, This Includes Good Room Air Quality. A Corresponding Concept For Ventilation And Ventilation Should Be Planned. The Window Ventilation In The Ventilation Concept Should Also Be Taken Into Account. Building Materials And Components, Which Ensure Positive Room Air Quality, Should Be Taken Into Account. The Indoor Climate Must Be Further Optimized In Preliminary Planning Via Meaningful Passive Measures (Construction, Storage Capacity Of The Components, Orientation, Coordinated Window Content). /// Energy Requirement: The Economical And Rational Use Of Energy Is A Primary Task Of Our Time Due To Scarce Resources And To Protect The Environment. The Carbon Dioxide Emissions Are To Be Reduced By Reducing Energy Consumption. The Aim Is To Consume As Little Energy As Possible And To Cover The Required Energy Requirement From Renewable Sources In The Long Term. The New Building Should Be Based On Energy -Optimized Construction Methods And, If Possible, Its Energy
Contact Information
Contact No.
+4971176963933
Email
christine.marquardt@kohlergrohe.de
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 94743420
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.