1. The Subject Of The Order Is The Renovation Of Apartments From The Housing Resource Of The Świebodzin Commune: Task 1. Capitential Renovation Of Four Apartments At Ul. 1 Maja 18/1, Ul. Młyńska 21/13A, Ul. Łużycka 23/3, Ul. J. Piłsudskiego 38/3. Żaków 2B/2 In Świebodzin.1.1. As Part Of The Implementation Of Task 1, Construction Works Should Be Carried Out In The Field Of: A) The Sanitary Industry, Including Disassembly Of Pipelines, Dishwasher Batteries, Electrical Thermal Baths, Pipeline Installation, Pipe Insulation, Battery Installation, Sinks, Paddling Pool, Radiators, Two-Function Boiler, Assembly Of Air And Air Concentric System, Tightness Tests, Accompanying Works, B) Construction Industry, Among Others Scraping And Washing Of Old Paints, Making Plaster Coats On Walls And Ceilings, Painting Walls And Ceilings Twice, Wall -Ups, Replacement Of Floor Joists, Floor Replacement, Assembly And Disassembly Of Ventilation Grilles, Replacement Of Window Joinery, Accompanying Robots, C) Electricity Industry, Among Others Replacement Of Lighting Fixtures, Warning, Accompanying Works. The Set Scope Of Construction Works For Execution Was Described In Construction Projects And In The Bill Of Quantities Constituting Annex 8 To Swz, Developed By Mgr Inż. Ewa Burnos Projektowe, Ul. Zachodnia 41, 66-200 Świebodzin. Task 1 Is Co -Financed By Bank Gospodarstwa Krajowego From The Funds Of Subsidies. 1.2. As Part Of Task 2, Construction Works Should Be Carried Out In The Field Of: A) Sanitary Industry, Including Disassembly Of Sanitary Facilities (Bathtub, Toilet Bowl, Sink) Of Pipelines, Sink Batteries, Assembly Of Drainage Approaches, Installation Of The Spray Cabin, Assembly Of The Toilet Bowl, The Approach To The Supply Of Cold And Warm Water, Installation Of The Battery Into The Washbasin And Spray Battery, Disassembly Of The Gas Furnace, Making The Gas Furnace, B) Industry, B) Industry. Budowlana, Among Others Disassembly Of Floors From Floor Panels, Plastics, Disassembly Of Floors From Tiles On Mortar And Glue, Disassembly Of Wall Coverings Located On Mortar And Glue, Disassembly Of Wooden Walls, Dismantling And Assembly Of Internal And Input Doors, Alignment Of Walls With Plaster Plaster, Facing Walls, Compounding Horizontal Substrates, Assembly Of Horizontal Substrates. From Artificial Stones, Assembly Of Floor Panel Floors, Plaster Coating On Walls And Ceilings, Double Painting Of The Walls, Accompanying Works, C) Electrical Industry: Furrowing For Plin Cables And Cans Sockets, Installation Of Cable Cables, Assembly Of Cans And Plug Sockets, Performing Warning, Accompanying Works. In The Pre-City Of Works Constituting Annex 8 To Swz, Developed By The Service And Commercial Office Tomasz Zaworski, Stary Dwór 35, 66-304 Brójce.
|