The Subject Of This Public Procurement Is Improving The Energy Efficiency Of The Detelina Dg Gorno Sahrane, Funded Under The Rdp 2014-2020. Short Description: The Kindergarten Building Is Located Freely In The Property. It Has The Covers 4 Garden Groups And 2 Nursery Groups. It Consists Of 5 Blocks. Block A, A And A Are Two -Storey, And Block B And C Are One -Tone, Economic. A Warm Connection Between The Blocks Forms An Inner Courtyard. Block A, And A Are Almost The Same As Distribution, Including The Floors. Each Block Consists Of Two Groups, With Block A And A Being Garden And In Block A ”Are Nurseries. At The Elevation Of 0.00 And Elevation +2,80 In Block A, And And A On Each Floor There Is One Group Consisting Of One Reception Room With Wardrobes, Classroom, Bedroom, Bathroom, Spill And Storage. The Blocks And Floors Are Connected To Each Other By Staircase Cells. In Block B Are Located The Administrative Sector And The Gym Together With The Necessary Changing Rooms. In Block C, A Kitchen Sector, Boiler And Pearl Are Located. All They Have Separate Entrances From The Outside, And The Kitchen Is Connected To An Internal Connection And The Rest Of The Building. The Building Was Built In 1982. The Construction Of The Building Is The Method Of Raised Slabs, With Brick Walls And A Flat Roof. Due To The Compromise Of Waterproofing In 2011. A Four -Sided Roof With Ceramic Tiles Is Made On It. The Drainage Is Externally With Gutters And Gutters. The Project Envisages The Implementation Of Energy Efficiency Measures. They Consist Of Laying Thermal Insulation On Facades And Roof And Replacement Of Existing Wooden And Metal Joinery On The Windows With A New One. Due To The Thermal Insulation On The Facades, It Is Envisaged To Build A New Lightning Protection Installation, Whose Tricks Must Be Built And Remain Below The Ti, Because The Construction Of The Four -Sided Roof Is Not Realized. The Project Development Provides For Access For Wheelchairs Only For The First Floor Of Block A And A . The Difference Between The Elevation Of 0.00 And The Elevation At The Main Entrance Is About 100Cm. To Overcome This Displacement, A Specialized Telescopic Wheelchair Ramp Will Be Purchased, Which Will Be Used As Needed. The Installation Of Additional Handles On The Walls For Difficult Mobile People Is Envisaged, And On The Main Entrances The Railings Will Be Installed Corresponding To Article 18, Paragraph 3 Of Ordinance No. Rd-02-20-2 Of 26.01.2021 To Determine The Accessibility Requirements And The Universal Design Of The Accessible Environment In The Urbanized Environment.
Contact Information
Contact Person
Краси Тодорова Кънчева
Contact No.
+359888581808
Email
KR_TODOROVA@mail.bg
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 94556131
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.