RATE CONTRACT FOR UPKEEP / MAINTENANCE OF EXISTING 33/11 kV RECEIVING STATIONS ALONG WITH THEIR 33 kV LINES AND FABRICATION & HANDLING OF MATERIAL OF DIVISIONAL STORE UNDER THE JURISDICTION OF SUB-TRANSMISSION DIVISION-I, JPDCL, JAMMU FOR THE YEAR2025-26- 1 Erection of 16 mtr long Steel Tubular Pole with planting depth of 1/6 th of the height of the pole including digging of pits, disposal of extra earth, collection of boulders and filling back. 2 Erection of 13 mtr long Steel Tubular Pole with planting depth of 1/6 th of the height of the pole including digging of pits, disposal of extra earth, collection of boulders and filling back. 3 Erection of 11 mtr long Steel Tubular Pole with planting depth of 1/6 th of the height of the pole including digging of pits, disposal of extra earth, collection of boulders and filling back. 4 Erection of 9 mtr long Steel Tubular Pole with planting depth of 1/6 th of the height of the pole including digging of pits, disposal of extra earth, collection of boulders and filling back. 5 Erection of 13 mtr long PCC Pole with planting depth of 1/6 th of the height of the pole including digging of pits, disposal of extra earth, collection of boulders and filling back. 6 Erection of 11 mtr long PCC Pole with planting depth of 1/6 th of the height of the pole including digging of pits, disposal of extra earth, collection of boulders and filling back. 7 Erection of 9 mtr long PCC Pole with planting depth of 1/6 th of the height of the pole including digging of pits, disposal of extra earth, collection of boulders and filling back. 8 Painting of 16 mtr long Steel Tubular Poleincluding fixtures with one coat of red-oxide and two coats of silver(aluminium) paint 9 Painting of 13 mtr long Steel Tubular Poleincluding fixtures with one coat of red-oxide and two coats of silver(aluminium) paint 10 Painting of 11 mtr long Steel Tubular Poleincluding fixtures with one coat of red-oxide and two coats of silver(aluminium) paint 11 Painting of 09 mtr long Steel Tubular Poleincluding fixtures with one coat of red-oxide and two coats of silver(aluminium) paint 12 Cement Bottoming (U/G,A/G) in 1:3:6 mix including excavation and form work, (16/13/11/9 Mtr Long Poles (Complete Job) 13 Fixing of Galvanisedspiral Earthing of SWG No. 8,G.I wire of 115 turns confirming to REC-J1 construction standard, (J1) 14 Fixing of 66/33KV Galvanised Guy Set (Guy wire, Guy Rods, Turn Buckle plate ,Guy Insulators) confirming to IS 2141 / 1979 or the latest version thereof including digging of pits & refilling 15 Collection of Snapped ACSR Cond. and Re-stringing, tensioning , binding of ACSR Conductor, (100mm2 ACSR Conductor) 16 Collection of Snapped ACSR Cond. and Re-stringing, tensioning , binding of ACSR Conductor, (150mm2 ACSR Conductor) 17 Collection of Snapped ACSR Cond. and Re-stringing, tensioning , binding of ACSR Conductor, (200mm2 ACSR Conductor) 18 Dismantling of Steel Tubular Pole including carriage up to dumping site, (16 mtr. Long ) up to distance of 50 mtr 19 Dismantling of Steel Tubular Pole including carriage up to dumping site, (13 mtr. Long ) up to distance of 50 mtr 20 Dismantling of Steel Tubular Pole including carriage up to dumping site, (11 mtr. Long )up to distance of 50 mtr 21 Dismantling of PCC Pole including carriage up to dumping site, (11 mtr. Long )up to distance of 50 mtr 22 Dismantling of Steel Tubular Pole including carriage up to dumping site, (9 mtr. Long )up to distance of 50 mtr 23 Dismantling of PCC Pole including carriage up to dumping site, (9 mtr. Long )up to distance of 50 mtr 24 Dismantling of Three/Four pole structure, opening of channels, crossarms, angles(Complete Job.) 25 Dismantling of Two pole structure, opening of channels, crossarms, angles (Complete Job.) 26 Straightening of tilted Steel Tubular Pole (16 mtr. Long ) 27 Straightening of tilted Steel Tubular Pole (13 mtr. Long ) 28 Straighteningof tilted Steel Tubular Pole(11 mtr. Long ) 29 Straighteningof tilted PCC Pole(11 mtr. Long ) 30 Straighteningof tilted Steel Tubular Pole(9 mtr. Long ) 31 Straighteningof tilted PCC Pole(9 mtr. Long ) 32 Unloading of Steel Tubular Pole including carriage up to dumping site, (16 mtr. Long )up to distance of 50 mtr 33 Unloading of Steel Tubular Pole including carriage up to dumping site, (13 mtr. Long )up to distance of 50 mtr 34 Unloading of Steel Tubular Pole including carriage up to dumping site, (11 mtr. Long ) 35 Unloading of Steel Tubular Pole including carriage up to dumping site, (9 mtr. Long ) up to distance of 50 mtr 36 Loading of Steel Tubular Poles including carriage up to dumping site, (16 mtr. Long ) 37 Loading of Steel Tubular Poles including carriage up to dumping site, (13 mtr. Long ) 38 Loading of Steel Tubular Poles including carriage up to dumping site, (11 mtr. Long ) 39 Loading of Steel Tubular Poles including carriage up to dumping site, (9 mtr. Long ) 40 Extra carriage from dumping site, (16 mtr. Long )up to site of work Its 100 mtr 41 Extra carriage from dumping site, (13 mtr. Long )up to site of work Ist 100 mtr 42 Extra carriage from dumping site, (11 mtr. Long )up to site of work Ist 100 mtr 43 Extra carriage from dumping site, (9 mtr. Long )up to site of work Ist 100 mtr 44 Extra carriage of 9 Mtr PCC Pole beyond 100mtrs for every 50Mtr or part thereof in plain areas 45 Extra carriage of 11 Mtr PCC Polebeyond 100mtrs for every 50Mtr or part thereof in plain areas 46 Extra carriage of 9 Mtr PCC Pole beyond 100mtrs for every 50Mtr or part thereof in semi hillyareas 47 Extra carriage of 11 Mtr PCC Pole beyond 100mtrs for every 50Mtr or part thereof in semi hilly areas 48 Unloading of Steel of Sorts , (Steel) 49 Loading of Steel of Sorts , (Steel) 50 Unloadingof Conductor Reels, (100mm²/150mm²/200mm² ACSR Conductor)at site 51 Loadingof Conductor Reels, (100mm²/150mm²/200mm² ACSR Conductor) at site 52 Fixing of 33 kVDiscInsulator (70 KN)2008 standards, (Porcelain ) 53 Fixing of 33 kV Disc fitting (70 KN) 2008 standards, (Polymer) 54 Fixing of 33 kV Insulators (10 KN) standards, (Porcelain ) 55 Fixing of33 kV Pin Insulators (10 KN) suitable for 100/150/200mm² ACSR Conductor. 56 Replacement/Fixing of 33 kVTension fittings (Socket & Ball type or T&C Type) for ACSR 57 Replacement/Fixing of 33 kV Tension fittings (Socket & Ball type or T&C Type) for ACSR 150m² 58 Replacement/Fixing of 33 kVTension fittings (Socket & Ball type or T&C Type) for ACSR 200m² 59 Straighteningof X-arms of different sizes (100x50x50x6 mm channel Iron,50x50x6mm Angle Iron ) duly painted with one coat of red-oxide and two coats of silver paint fixing with different sizes and sorts of nuts,bolts and washers, (Channel Iron X-arms, Angle Iron-X-arms, Pole Tops) 60 Straighteningof angle ironof different sizes (65x65x6 mm channel Iron,50x50x6mm Angle Iron 61 Repair and re-erection of Cradle for guard netting with GI wire 8 No including wire binding, cutting /bending of GI Wireas per REC standards 62 Branch cutting of 33 kV lines 63 Removing of wild climbers/vegetation around 33 kv Poles 64 Removing of wild climbers/vegetation around 33 kV Tower 65 Removing of wild climbers from top of 33 kV Lines. 66 Removing of wild climbers from Peak, cage, cross arm of 33 kV old tower Line 67 Patrolling of 33 kV Line(Routine/Under fault) 68 Tightening of loose guys 69 Dismantling & re-erection of damaged guys including digging of pit & refilling the same 70 Replacement of damaged Disc insulator in tension string 71 Replacement of cross arms of sizes 100x50x6 72 Replacement of angle iron of sizes (65x65x6, 50x50x6) 73 Replacement of Pin insulator on Four/Three/Double Pole Structure 74 Replacement of Pin insulator on Single Pole Structure 75 Replacement of Worn-out/Damaged Jumper of 33 kV Towerlines 76 Replacement of Disc Insulator, Suspension Fitting of 633 kV Towerlines 77 Replacement of worn-out/Loose/Damaged Jumper of 33 kV lines (sets of3 Nos) 78 Local earthing of 33 kV Lines by way of using discharge/earth rods at faulty site to avoid accident due to any induction while working on Line. 79 Tightening / restringing of loose ACSR Dog 100 mm2 80 Tightening / restringing of loose ACSR Wolf 150 mm2 81 Tightening / restringing of loose ACSR Panther200 mm2 82 Dismantling & Re-erection of ACSR Dog 100mm2 including collection of dismantled conductor , making of small bundles and its carriage 83 Dismantling & Re-erection of ACSR Wolf 150mm2 including collection of dismantled conductor , making of small bundles and its carriage 84 Dismantling & Re-erection of ACSR panther 200mm2 including collection of dismantled conductor , making of small bundles and its carriage 85 Dismantling of stay sets complete 86 33 KV VCB Repairs & Renovationby way of a) Setting of Mechanical Assembly / Replacement of damaged spring / Repair of locking & charging system 87 b) Replacement of Tripping Coil/Closing coil 88 c) Replacement of Damaged Vacuum Interrupter 89 d) Replacement ofBushing including Clamps 90 33 kV C&R Panel: Replacement of different equipment"sa) Ammeter, Volt Meter Indication , Lamps, Fuses, Trip Close Switch ,Selector SwitchIdentification of Panel Wiring Faults & its rectification 91 b) Replacement of Different Relays - MITNumerical Relay / Electro-mechanical relay / Master Trip Relay/ Differential Relay/Auxiliary Relay etc. 92 Installation, Testing, commissioning of 66-33 kV Control Relay Panels (Complete Job) 93 Complete testing of Relays Setting of Testing Kit, Interconnection between various points of panel with respect tosecondary injection key on various current taps, recording the observation thereof. All modifications necessary to achieve desired results. 94 Control Cable Replacement of damagedControl Cables of all typesincluding binding with PVC Belts/ Binding Wire, Peeling of insulation and fixing of proper size thimble connecting the cable after identification of each core to both ends i.e. Panel to CTs / panel toPTs /panel to Breaker and Making functional of 33 KV Outdoor Breakers, Protection , Alarms, Annunciation (complete Job) 95 Upkeep of earthing of aux. transformer 96 Upkeep of earthing of Power transformer 97 Upkeep of earthing of 33/11 kV LA 98 Providing of extra earthing for improvement purpose (complete job) 99 Upkeep of earth mat of out door yard 100 Replacement of damaged earth mesh in Sub-Station as per approved Map & Design. 101 Excavation of trenches of 0.6 Mtr Depth and 2.0 Mtr wide mtr in normal soil / hard soil 102 Repairing / Laying of MS Flat and MS Rod in deep excavated trench and welding of MS Flat & MS Rod with Mesh. 103 Repairing of Earthing with Spikes of MS Rod 20mm, 3 Mtr in Length as per REC Drawing 104 33/11 KV Power Transformera) Opening of Transformer Tank Top Cover to prevent oil leakage from top(if required to facilitate maintenance of transformer after removing the required accessories), ,Draining/ Re-Filling of required Oil, Change of gaskets of valves/ radiators/ Buchholz"s relay radiators valves of power transformer of capacity: 3.15 MVA to 10 MVA 105 b) Replacement of silica gel 106 c) General Inspection by through inspection of each individual parts, Ratio test by applying voltage on HV Side and measuring LV Voltage on various Tap Positions, checking of Buchholz relay, Surge relay conservator, sensors, measurement of 1R-Value dialectic strength of oil, cleaning of Power Transformer etc 107 d) Replacement of any one of the following i.e. temperature indicators, gas operated Buchholz"s relay, oil temperature indicator, winding temperature indicator etc 108 e) Preventing of leakage by changing main gaskets after removing the old gasket, Replacement of HV/LV Busing & Bush Rod,Ring and Rubber Washers (complete job to prevent leakages) 109 f) Cleaning of Scale deposited over the body and radiators of the power transformer with thinner/ detergent and de-rusting in perfect manner.(routine work) 110 g) Cleaning of LV/HV bushings of Power Transformer(routine work) 111 h) Replacement of Bus Bars ofPower Transformer 112 i) Replacement of LV/HV clamps of Power Transformer 113 Oil Topping of Power Transformer 10 MVA 114 Oil Topping of Power Transformer 4 MVA to 6.3 MVA 115 Oil Topping of Power Transformer 3.15 MVA 116 Recording of IR values of transformers 117 Installation, Testing and Commissing of Power Transformer 66-33/11 KV Installation of LV/HV Bus Bars with proper care, of transformer for any leakagecommissioning of Power of Transformers by applying low voltageapproximately equal to impedance voltage on HV Side and short circuiting the LV terminals, Energizing the transformer by applying required primary voltage to it & keeping the transformer on no load to observe the behaviour of transformer, setting on 25% of the load on the transformer for a period of at test 6 hours and observation of oil including temperature, increase the transformer is fully loaded and topping of oil.a) 10 MVA 118 b) 6.3 MVA 119 c) upto 5 MVA 120 Checking and tightening of Jumpers, Droppers in 66/33 KV Outdoor Yard 121 Replacement of T/PG clamps 122 Replacement of Disc insulators including its hardware. 123 33 KV LA & 11 KV Stn. Type LAReplacement of 66 KV,33 KV & 11 KV Lightening Arrestor including jumpering and earth connecting in all respect. a) 66 KV LA 124 b) 33 KV LA 125 b) 11 KV LA 126 Separate pipe Earthing / G.I Rod earthingas per REC Drawing J.2 127 Replacement of pipe earthing / Rod earthing with new one 128 Installation, testing and Commissioning, replacement of 66 KV Isolators 129 Installation, testing and Commissioning,replacement of 33 KV Isolators 130 Replacement of11 KV Isolators 131 Repair & Renovationof 66/33 KV and 11 KV isolators including setting right its alignment for proper operation, lubrication/greasing of jaws, bearings operating"s handle etc(complete job) 132 Replacement of worn-out/heated Pad clamp/Isolator clamps of 66/33/11 kV Isolator by way of dismantling. Drilling of holes on new and fixing (complete job) 133 Repair & Renovationof Isolator Jaws 66/33 KV and 11 KV isolators.(complete job) 134 Replacement of post insulator / tendon pipes/ operating box by way of dimentalling, necessary fabrication where ever required for proper operation of 66/33/11 kv Isolators. 135 33 KV CTsInstallation, testing and Commissioning of 33 kV CTs ( of all ratios )Complete Job 136 33 KV CTsRepairs & Renovation of 33 KV CTs by way of replacing shorting strips, connecting rod, transformer oil, damaged insulator (CT"s of all ratios) 137 Replacement of 33 KV Outdoor Type CT of different ratio and dismantling of damaged CT(CT"s of all ratios) 138 Oil Topping of 66/33 kV CT & PT by way of opening of top cover and refixing with new gaskets if necessary and preventing of oil leakages if any.(complete job) 139 66-33 kV PTsInstallation, testing and Commissioning of 66-33 kV PTs (complete job) 140 66 kV PTsReplacement of 66 KV Outdoor Type PT and dismantling of damaged PT, dragging to installation/loading site, lifting from ground to steel structure. 141 33 kV PTsReplacement of 66 KV Outdoor Type PT and dismantling of damaged PT, dragging to installation/loading site, lifting from ground to steel structure 142 Cleaning of porcelain bushing, tightening ofPT/CT clamps, derusting & painting of body of 33 kV PTs & CTs 143 Tightening of nuts & bolts, replacement of oval thread bolts, chipping by way of welding to the bolts after tightening in a single bay 144 Painting with mix red oxide paint two coats of approved make on steel works after cleaning with wire brush/ sand paper 145 Painting of steel structure erected in outdoor yard with aluminium paint two coats with approved brand andfixture to given an even surface 146 Battery Banka) Repair & maintenance of battery set including maintaining specific gravity, electrolyte level, cleaning, checking, tightening of battery terminals in all respects it includes measuring voltage of each battery. 147 b) Tightening of all nut and bolts, replacement of damaged battery cells 148 c) Installation, testing and Commissioning of Battery Bank (complete Job) 149 Battery ChargerRepair/Renovation battery charger for proper functioning by way of replacement of rectifier unit, Ammeter, Voltmeter, MCB,Cooling fan, LED indications, buzzer alarms for OV/UV etc (Complete Job) 150 Repair and maintenance of DC Board, identification of fault in respect of cableand its replacement, replacement of damaged MCCB, Kit Kat, Bus Bar & other allied job. 151 Repair and maintenance of AC Board, identification of fault in respect of cableand its replacement, replacement of damaged MCCB, Kit Kat, Bus Bar & other allied job. 152 Installation, testing and Commissioning of Battery Charger (complete Job) 153 Deweeding of vegetation in outdoor yardRemoving of stone metal, deweeding of unwanted vegetation, spreading of stone metal collected earlier for removal of vegetation, levelling the area with existing stone metal 154 Providing of additional stone metal and its carriage and laying in outdoor yard, this including breaking of stones complete job. 155 Cleaning of Control Room, removing dirt & dust from the panels, walls, cleaning of fixtures (for one bank) 156 Painting of internal/external walls and roof by approved brand of oil based distemper 157 Painting of door and window panels of control room by approved brand of paint 158 Repairs & Renovation of 11 KV VCB,by way of replacement of a) Grid-spout assembly 159 b)Replacement of damaged CTs of different ratio Testing the CT with the help of primary injection set fixing in pannel, fixing the secondary connection after assessing the load (complete job) 160 c)Thorough checking of control wiring circuits, replacement of damaged wire if any, replacement of terminal plates, tripping circuits, close/ trip switch, ammeter switch, replacement of voltmeter & ammeter . 161 d) Replacement of 11 KV damaged PT 162 e) Replacement of blown fuses, checking the PT terminal with respect of 11 KV bus bar complete job. 163 f) Replacement of Trip/Close coil 164 g) Replacement of Trivector meter on 11/33/66 kV Panels 165 Installation, testing and Commissioning , replacement of LT cabele 166 11 KV Power Cables / 33 KV Power cables/66 KV Power cablesa) Identification of damaged portion of cable, tracing of cable, remove cable from trench, carriage and laying of cable(complete job) including cleaning of cable trenches. 167 b) Replacement of damaged cable of sizes 168 Replacementof termination kits of different sizes, connecting the cable with panel and outgoing structures after crimping of lugs fixing with nuts and bolts, checking of earth point, connecting the earthing point of cable with existing earthing system a) 11 KV Indoor Termination Kit (1-Phase/ 3 phase) 169 b) 11 KV Outdoor Termination Kit (1-Phase/ 3 phase) 170 c) 33 KV Indoor Termination Kit (Single Phase) 171 d) 33 KV Outdoor Termination Kit (Three Phase) 172 e) 33 KV Indoor Termination Kit (Three Phase) 173 f) 33 KV Outdoor Termination Kit (Single Phase) 174 Improvement of earthing system in control room by way of replacement of earthing risers from earthing point to panel / checking of all welding points/ re-welding of lose connection, laying of fresh / additional earth-mat strip to improve the existing earthing system (Complete one Panel set) 175 Checking of IR values 176 De-watering of receiving station to avoid water logging. 177 Repairing of electrical circuits for improvement of control room immunination, power points etc (Complete Job) 178 Installation, Testing, commissiing for replacement of Aux. Transformer at receiving station 179 On site repairing of aux transformer for missing phase, LT strip, LT bush rod, LT bush cup, HT bush rod etc (Complete job) 180 Transport charges for carriage of T&P, men & material on urgent basis during power breakdown and restoration of system. (auto carrier) aditional 1km @ 90/per km 181 Replacement of out door yard lights including wiring system and fixing oflamps on fixtures. 182 Marking of equipment"s, sign boards by way of painting/fixing of PVC plates for demarcation of different equipment to avoid mishandling. 183 Replacement/repair/fixing of ceiling fans at Receiving station. 184 Replacement/repair/fixing of cooling fans on radiators of power transformer to avoid heating. 185 Flash in 66KV,33 KV & 11 KV Panels due to overloading moisture, Cleaning of carbonized panel by petrol / cotton cloth, replacement of damaged / worn-out lugs, post insulator, Bakelite sheet, arcing chamber panel heaters etc. 186 Repair of plaster of thickness 12 mm to 20 mm in patches of areas 2.5 sqm meters and under including cutting the patch in proper shape and preparing and plastering the surface of the walls complete incl. disposal of rubbish to the dumping ground within 50 M leada) with Cement mortar 1:4 (1 cement : 4 fine / coarse sand) 187 Cutting of large tree branches falling over 33/11 lines and coming into the corridor to avoid damages/ faults/conductor snapping. 188 Cleaning of cable duct, removing of duct covers and placing back after cleaning the duct including disposal of rubbish up to 50 Mtr lead 189 Replacing sand store slabs in roofing, laid incement mortar 1:4 (1 cement : 4 coarse sand) including necessary repairs and cement painting with same mortar complete, including disposal of rubbish to dumping ground within 50 Meters of lead 190 Dismantling doors, windows and clerestory windows (steel or wood) shutter including chow khats, holdfast etc. Complete and stacking with 50 Mtr lead 191 Providing and fixing T-iron frames for doors, windows and ventilators of mild steel T-sections, joints mitred and welded, including fixing of necessary but hinges and screws and applying a priming coat of approved steel primer (CC 1:3:6) 192 Demolishing cement concrete manually / by mechanical means including disposal of material within 50 Mtr 193 Cement concrete 1:2:4 (1 Cement : 2 Coarse Sand : 4 graded Stone aggregate)62 mm thick 194 Roof top treatment to prevent water leakage of control room 195 Repairing of receiving station mesh fencing / Chain link mesh fencing height upto 8ft 196 Watering of earth pits 197 Cleaning/washing of solar panels & batteries 198 Cleaning of ACDC,DBDC Board, RTCC, Charger, Battery Bank, Solar batteries, other alike small equipments (complete Job) 199 Cleaning of 33 kV CRP using vacuum cleaner from inside with proper care, from outside with thinner/varnish and making 33 kV CRP Vermic Proof. 200 Cleaning of 11 kV Panel using vacuum cleaner from inside with proper care, from outside with thinner/varnish and making it Vermic Proof to avoid rodent faults. 201 New 33 KV Line Fabrication , erection and painting of 15 Mtr long 33 KV Self supporting tower structure for crossing of road 202 Laying of foundation for 33 KV self supporting Tower Structure 15 Mrs. long including setting of stubs complete job 203 Erection of Channel cross arm of size 100X50X 6mm ,10 feet long and above including fixing of MS flat iron clamps with required size of bolts including punching of bolts complete 204 Erection of Channel cross arm of size 100X50X 6mm up to 09 feet long including fixing of ms flat clamps with required size of bolts including punching of bolts complete 205 Erection of Angle Iron Braces of size 65X65X6 mm,fixing with double clamp of MS Flat including punching of bolts of Ist level to level 3rd in cross section typeabove up to 14"longcomplete 206 Erection of Angle Iron Braces of size 65X65X6 mm along with belts of same size ,fixing with double clamp of MS Flat including punching of bolts of Ist level to level 3rd in cross section type 6" and above upto 10"longcomplete 207 Erection of Angle Iron belts of size 50X50X 6 mm along with belts of same size ,fixing with double clamp of MS Flat including punching of bolts of Ist level to level 3rd in cross section type upto 10" long 208 Erection of Angle Ironof size 65X65X6 mmfixing with double clamp of MS Flat including punching of bolts of Ist level to level 3rd in crossection typeabove11" long complete for guardnetting. 209 Flat iron ties 50x6 mm size 1 feet long along with fixing with cross arms 210 Erection of 33 KV Disc insulator (polymer type )with tension fittings including punching of locking pinscomplete 211 Erection of 33 KV Pin insulator with pins3 nos on top of cross arm including fixing of MS Flat Ties to rest it on , punching of base bolt /locking pin complete 212 Erection of Guy rodincluding digging of pit , Disposal of excavated soil ,refilling of excavated pits in layers of stone boulders and fine soil including fixing , adjusting properly Turn Buckle, Anchor Plate and staining screw complete 213 Carriage at site , un-bundling , Laying and stringing of ACSR DOG Conductor including making of small bundles of conductor as per site requirement, cutting in required span lengths complete (AS PER REC STANDARD) 214 Erection of anti climbing Devices at ST pole along with fixing /cutting /bending of Barbed wire, fixing with clamps 215 Erection of Danger plates 216 Route /temp path clearance by way of cleaning bushes and vegetation & making temp. pathcutting & filling for carriage of line material ( 400 mx1mx0.2m)= 80 cum 217 Watch and ward of the material and T&P round the clock i.e. 3 shifts, Rate of 1 Lab for 1 Shift 218 Route clearance for corridor of 5 m 219 Installation, testing and Commissioningof 3.15 MVA , 33/11KV Power Transformer (new work) 220 Installation, testing and Commissioning of 5 MVA& 6.3 MVA , 33/11 KV Power Transformer 221 Installation, testing and Commissioningof 10 MVA , 33/11KV Power Transformer 222 Installation, testing and Commissioning of 11kV Panel Borad with VCB Incomer(one no.) 223 Installation, testing and Commissioning of 11kV Panel Borad with VCB outgoing(one no.) 224 Setting of stubs with templates after positioning and leveling of templates excluding cost of foundations 225 Handling and Fabrication of Material in Divisional Store, Fabrication of Angle iron braces/belts /guard netting angles,fencing posts etc from angle iron of sizes 226 Fabrication of guy rods complete including turn buckle, staining screw, anchor plate, thereading of guys and staining screw 227 Fabrication of channel cross arms of sorts from MS channel of sizes , Making holes as per requirement,Punching of members and numbering on each member,Grinding of sharp edges and uneven surface of memebers and painting of members with red oxide paint. 228 Fabrication of ties, clampsfrom MS flat ( suitable for 9 mts, 11mts, and 13mts poles) 229 Fabrication of earthing plates , cable duct coversfrom MS plate as per REC drawings 230 Fabrication of earthing spikes from MS Tor steel of sorts as per REC drawings 231 Fabrication of ST poles by way of drilling of extra holes 232 Fabrication of foundation boltsfrom MS Tor steel of sorts including threading as per REC drawings 233 Fabrication of earthing pipe from GI pipe and welding of earthing plateas per REC drawings 234 Fabrication of column structures, beam structure, isolator structures,LA ,CT,PT and PI Structures as per REC drawings 235 Shifting of channel/Angle /Flat iron at and average distance of 50mtr from unloading site to site of stacking and stacked properly. 236 Shifting of channel/Angle /Flat iron/fabricated material at and average distance of 50mtr for making space for other store material and its stacking . 237 Unloading of ST poles 9mtr in divisional store 238 Unloading of ST poles 11mtrin divisional store 239 Unloading of ST poles 13mtrin divisional store 240 Unloading of ST poles 16mtrin divisional store 241 Unloading of PCC Poles 9/8 mtr . in divisional store 242 Unloading of PCC Poles 11 mtrin divisional store 243 Unloading of PCC Poles 13 mtr in divisional store 244 Dragging/shifting of PCC/ST Pole at and average istance upto 50 mtr for stacking to accesible place for loading/unloading purpose and its satacking 245 Unloading of ACSR Conductor dogin divisional store 246 Unloading of ACSR Conductor wolfin divisional store 247 Unloading of ACSR Conductor pantherin divisional store 248 Shifting of Old/New ACSR Conductor at and average distance of 50mtr for unloading site to site of stacking and stacked properlyand also for making space for other store material and its stacking .. 249 Unloading of 11KV VCB pannels (1+3) 250 Unloading of 11KV VCB pannels (1+4) . 251 Unloading of 11KV VCB pannels (1+5) . 252 Unloading of 11KV VCB pannels OK/Damage(1no) . 253 Unloading ofAC Board/DC Board/Battery bank/ Battery charger 254 Unloading of 33 VCB /C&R Pannel . 255 Shifting/ draggingof 11/33/66kv panel at an average distance of 50mtr for making space for other store material and its stacking also for making space for other store material and its stacking . 256 Unloading of XLPE Cable 120/185 mm² . 257 Unloading of XLPE Cable 240/300 mm² . 258 Unloading of XLPE Cable 400/630 mm² . 259 Shifting of XLPE Cable all sizes at an average distance of 50mtr from unloading site to site of stacking and stacked properly also for making space for other store material and its stacking ... 260 Unloading of 66/33/11 KV Cable kits of different sizes 261 Shifting of 66/33/11 Cable kits of all sizes at an average distance of 50mtr from unloading site to site of stacking and stacked properly also for making space for other store material and its stacking ... 262 Unloading of Guy/GI wire/Barbed wire including carriage towards stacking site and stacked porperly. 263 Unloading of Power Transformer 3.15/4 MVA New/damage . 264 Unloading of Power Transformer 5/6.3MVA New/damage . 265 Unloading of Power Transformer 10 MVA New/damage . 266 Unloading of 11KV New/damage DistributionTransformer. 267 Dragging of 3.15/4 MVA New/damage Transformer at an average distance upto 50 mtr for stacking to accesible place for loading/unloading purpose and its satacking 268 Dragging of 5/6.3 MVA New/damageTransformer at an average distance upto 50 mtr for stacking to accesible place for loading/unloading purpose and its satacking 269 Dragging of 10 MVA New/damage Transformer at an average distance upto 50 mtr for stacking to accesible place for loading/unloading purpose and its satacking 270 Dragging of 11kv Transformer at an average distance upto 50 mtr for stacking to accesible place for loading/unloading purpose and its satacking 271 Unloading ofTransformer oil Barrels. 272 Dragging ofTransformer oil old/ new barrel at an average distance upto 50 mtr for stacking to accesible place for loading/unloading purpose and its satacking also for making space for other store material and its stacking .. 273 Unloading ofMS Angle, MS Channel, MS flate ,tar steel 274 Unloading of hardware items such as nuts and bolts , clamps of sorts, washers,welding rods,old sarees,chain link mesh,pipe etc . 275 Shifting ofhardware items such as nuts and bolts , clamps of sorts, washers,welding rods,old sarees,chain link mesh,pipe etc at an average distance of 50mtr for making space for other store material and its stacking . 276 Unloading of 33/11 KV Dics insulators. 277 Unloading of 33 KV Dics fittings 278 Shiftingof 33/11KV disc insulator at an average distance upto 50 mtr for stacking to accesible place for loading/unloading purpose and its satackingalso for making space for other store material and its stacking .. . 279 Unloading of 33/11 KV Pin insulators/Guy insulator /G.I Pin. 280 Shiftingof 33/11KV pin insulator /guy/G.I Pinsat an average distance upto 50 mtr for stacking to accesible place for loading/unloading purpose and also for making space for other store material and its stacking. 281 Unloading of Cement. 282 Shiftingofcement/cement block at an average distance upto 50 mtr for stacking to accesible place for loading/unloading purpose and also for making space for other store material and its stacking ... 283 Unloading of 33 KV CT/PTUnit . 284 Shifting of 33 KV CT/PT at an average distance of 50mtr for making space for other store material and its stacking . 285 Unloading of 11 KV CT/PTUnit includingcarriage towards stacking site and stacked porperly. 286 Shiftingof 11 KV CT/PTat an average distance upto 50 mtr for stacking to accesible place for loading/unloading purpose and also for making space for other store material and its stacking .. 287 Unloading of 33 KV Isolators. 288 Shiftingof 33KV Issolatorsat an average distance upto 50 mtr for stacking to accesible place for loading/unloading purpose and its satackingand also for making space for other store material and its stacking . . 289 Unloading of 33/66 KV LAs. 290 Shiftingof 33/66KV LAsat an average distance upto 50 mtr for stacking to accesible place for loading/unloading purpose and also for making space for other store material and its stacking . 291 Unloading of 11 KV LAs/GO/HG/issolator . 292 Shiftingof 11 KV LAs/GO/HG/issolator at an average distance upto 50 mtr for stacking to accesible place for loading/unloading purpose and also for making space for other store material and its stacking .. 293 Unloading of PVC Cable /Control cable of different sizeincludingcarriage towards stacking site and stacked porperly. 294 Unloading of AL Paint /Red oxide paint/ Black paintincludingcarriage towards stacking site and stacked porperly. 295 Unloading of T&P Items like Drilling machine,chainPully ,Pully lifting machine ,Hand drill machine,AL ladder,welding set,tool kit,crimping tooletc 296 Unloading of Testing equipments like Meggar, Earth resitivitytester , Oil testing machine,Search Light, Turn ratio meter , multimeter etc . 297 Unloading of Safetyequipments like Safety belts, Safety shoes, Fire Extinguisher,Hand gloves, Yard lights , LED Bulbs , Rubber mat , etc 298 Shiftingof T&P /Testing / Safetyequipments at an average distance upto 50 mtr for stacking to accesible place for loading/unloading purpose and also for making space for other store material and its stacking .. 299 Unloading of Filter plant heavy duty 300 Shiftingof Filter plantat an average distance upto 50 mtr for stacking to accesible place for loading/unloading purpose and also for making space for other store material and its stacking . 301 Loading of PCC Poles 9/8 mtr 302 Loading of PCC Poles 11 mtr 303 Loading of PCC Poles 13 mtr 304 Loading of ST poles 9mtr 305 Loading of ST poles 11mtr 306 Loading of ST poles 13mtr 307 Loading of ST poles 16mtr 308 Loading of ACSR Conductor dog 309 Loading of ACSR Conductor wolf 310 Loading of ACSR Conductor panther 311 Loading of Cement 312 Loading of 11 KV VCB 1+3 Pannels 313 Loading of 11 KV VCB 1+4 Pannels 314 Loading of 11 KV VCB 1+5 Pannels 315 Loading of 11 KV VCB 1 Pannel OK/Damage 316 Loading of AC Board/ DC Board/Battery charger /Battery bank 317 Loading of 33KV VCB 318 Loading of 33KV C&R Pannels 319 Loading of XLPE Cable 120/185 mm² 320 Loading of XLPE Cable 240/300mm² 321 Loading of XLPE Cable 400/630 mm² 322 Loading of Cable kits of different sizes 323 Loading of Guy/GI wire/Barber wire 324 Loading of Power Transformer 3.15/4.0 MVA 325 Loading of Power Transformer 5.0/6.3 MVA 326 Loading of Power Transformer 10 MVA 327 Loading of 11 KV DistributionTransformer 328 Loading of Transformer Oil barrels 329 Loading of MS Angle iron braces, MS channel cross arms, Guy rod, Earthing spikes, MS Flate 330 Loading of hardware items such as nuts and bolts, clamps of sorts,washers,welding rods,old sarees,chain link mesh,pipe 331 Loading of 33 /11KV Disc insulator 332 Loading of 33 KV Disc fitting 333 Loading of 33/11 KV Pin insulator /Guy insulator /G.I Pin 334 Loading of 33 KV isolator 335 Loading of 33 KV LA 336 Loading of 11KV Isolators 337 Loading of PVC Cable /Control cable of different size includingcarriage from stacked site. 338 Loading ofAL Paint /Red oxide paint/ Black paint 339 Loading ofFilter plant heavy duty 340 Carriageof Fabrication column structures, beam structure, isolator structures,LA ,CT,PT and PI Structures etc towards stacking site and stacked properly 341 Loading ofFabrication column structures, beam structure, isolator structures,LA ,CT,PT and PI Structures etcincludingcarriage from stacked site. 342 Loading of 33 KV CT/PT units 343 Loading of 11 KV CT/PT units 344 Loading of T&P Items like Drilling machine,chainPully ,Pully lifting machine, Hand drill machine,AL ladder,welding set,tool kit,crimping tooletc units 345 Loading of Testing equipments like Meggar, Earth resitivitytester , Oil testing machine,Search Light, Turn ratio meter , multimeter etc units 346 Loading of Safetyequipments like Safety belts, Safety shoes, Fire Extinguisher,Hand gloves, Yard lights , LED Bulbs , Rubber mat , etcunits 347 Shifting of allied materials for making space for porper stacking of material 348 Carriageof Fabrication material from fabrication site towardsstacking site and proper stacking of material. 349 Repair of store shed by way of replacement of damaged CGI sheets, repair of CGI sheets by way of welding, replacememt of hooks, nuts and bolts, tightening of nuts bolts and hooks and welding . 350 Collection andcarriage of T&P items to working site and back crriage of T&P after job 351 Sorting of material by way of weighing / measuring and inspection of material and then carriage from weighing / measuring and inspection site to site of fabrication 352 painting of store shed with red oxide/Al paint single coat 353 Checking/Measuring/ Inspection/Meggering ofXLPE Cable/Control cable by way of unreal and after work agian rereelingon drum 354 Checking/Measuring/ Inspection ofACSR Conductorby way of unreal and after work agian rereelingon drum 355 Complete testing/ispection of pannels including relay testing , interconnection,charging polarity etc during issue/receipt/verification. 356 Prototype errection of Gantry /Beam/CT/PT/Isolator sturcture 357 Dismentling of ACSR Dog Conductor 358 Dismentling of ACSR Wolf Conductor 359 Dismentling of ACSR Panther Conductor 360 Dismentling of 3.15 MVA, 33/11 KV Power Transformer including dismentling of Cables, Radietors, drainage of Oil and filling in empty Barrels 361 Dismentling of 6.3 MVA, 33/11 KV Power Transformer including dismentling of Cables, Radietors, drainage of Oil and filling in empty Barrels 362 Dismentling of 10 MVA, 33/11 KV Power Transformer including dismentling of Cables, Radietors, drainage of Oil and filling in empty Barrels 363 Dismentling of 11 KV Panel Board with VCB (Incommer) 364 Dismentling of 11 KV Panel Board with VCB (Outgoing) 365 Installation of SMPS & CMR on Smart Meters 366 Installation/Replacement of Smart Meters
|