Tender For Widening Of Jain Mandir To Hanuman Mandir To Road Work - Excavation for road way in soil by mechanical means including cutting and transporting the earth to site of embankment/dumping area with lead upto1000 metres, including trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections. Including all cost of Material, Labour & T&P all taxes, labour cess etc but Excluding GST. (MORTH 301) 2 Construction of Subgrade and Earthen Shoulders Construction of sub-grade and earthen shoulders with approved material obtained from road way side with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2. Including all cost of Material, Labour & T&P all taxes, labour cess etc but carted earth from a distence 3.00 Km Excluding GST. (MORTH 305) 3 Mechanically compaction of earth work compacted to 95% proctor density in ordinary soil, excavation to be done form of regular pits not exceeding 0.5mtr in depth and work in embankment to be in 20cm layer including ramming and dressing pulverization surfacing including supply of labour, T&P, Roller and water sprinkler etc. Including all cost of Material, Labour & T&P all taxes, labour cess etc but Excluding GST. 4 Construction of granular sub-base by providing coarse graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401. Including all cost of Material, Labour & T&P all taxes, labour cess etc but Excluding GST. (MORTH 401) 5 Construction of un-reinforced, Dowel jointedplain cement concrete pavement over a prepared sub base with 43 grade cement @ 400 kg per cum, coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, dowel bars, separation membrane, sealant primer, joint sealant, debonding strip, admixtures as approved, curing compound, finishing to lines and grades as per drawing. Including all cost of Material, Labour & T&P all taxes, labour cess etc but Excluding GST. (MORTH 602) 6 Providing and laying cement concrete in 1:4:8 (1 Cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) and curing complete, Including cost of form work. in Foundation and floors. Including all cost of Material, Labour & T&P all taxes, labour cess etc but Excluding GST. 7 Class-150 (Non Modular) brick work in 1:3 cement and Coarse sandmortar in foundation and plinth including supply of all materials, labour and T&P etc. required for proper completion of the work. Including all cost of Material, Labour & T&P all taxes, labour cess etc but Excluding GST. 8 Pointing on brick work with cement mortar 1:3 (1Cement : 3 Fine Sand) (A) Flush pointing. Including all cost of Material, Labour & T&P all taxes, labour cess etc but Excluding GST.
|