Providing Men, Machinery, Materials For Execution Of Emergent Works At Site As Per Requirement Due To Siltation/ Damages/ Breaches/ Floods/ Calamities/Encroachment Removal (If Any) Etc For Irrigation Sub-Division Suthsoo For The Year 2025-26- 1 Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge.All kinds of soil : 2 Extra for every additional lift of 1.5 m or part thereof in excavation/banking excavated or stacked material :All kinds of soil : 3 Ordinary or hard rock 4 Banking excavated earth in layers not exceeding 20cm in depth, breaking clods, watering, rolling each layer with 1/2 tonne roller, or wooden or steel rammers, and rolling every 3rd and top-most layer with power roller of minimum 8 tonnes and dressing up, in embankments for roads, flood banks, marginal banks, and guide banks etc. lead upto 50 m and lift upto 1.5 m in All kinds of soil: 5 Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge.All kinds of soil : 6 Silt clearance from canals. Inclusive of initial lead and lift ( 50m & 1.5m respectively )Wet 7 Dry 8 Slip clearance in soils; In ordinary soils disposal lead upto 50 m and lift upto 1.5 m 9 Slip clearance in soils; mixed with moorum/Kankar/shingle/boulders; disposal.lead upto 50 m and lift upto 1.5 m. 10 Weed clearance from canals (including extraction of roots) 11 Removal of unhygienic materials (so classified by the site engineer) from designated sites and its disposal as per directions, all inclusive. 12 Providing and laying earth/sand filled cement bags including cost of EC Bags, cost of excavation (available Earth), filling, loading, unloading, laying, sewing and strings etc all carriages complete job as per the directions of Engr-in-charge 13 Providing and laying earth filled cement bags including cost of EC Bags, filling, loading, unloading, laying, sewing and strings etc all carriages complete job as per the directions of Engr-in-charge.Note: - Supply of earth shall be paid separately 14 Excavating, supplying and filling of local earth (including royalty)by mechanical transport upto a lead of 5 km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete. 15 Providing and laying of polythene of specified weight of 250 gsm of approved brand and colour incl. all carriages complete job 16 Engagement of mechanical excavator (JCB) for different nature of works incl. cost of service of operating staff, cost of POL and all other comsumable for the machinery at site as directed by in charge engineer 17 Engagement of vehicles (Tractors) for different nature of works incl. cost of service of operating staff, cost of POL and all other comsumable for the machinery at site as directed by in charge engineer including loading, unloading and lead upto 10km (2.50 Cum) 18 Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) 19 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) 20 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) 21 Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) 22 Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo-Mechanically Treated bars of grade Fe-500D or more. 23 Structural steel work in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all completeWelded 24 Providing and fixing 1mm thick M.S. sheet sliding-shutters with frame and diagonals braces of 40x40x6mm angle iron, 3mm M.S. gusset plates at the junction and corners, 25mm dia pulley, 40x40x6mm angle and T-iron guide at the top and bottom respectively including applying a priming coat of approved steel primer, 25 Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns 26 Dumping stone excluding cost of stones in Horizontal on level 27 Hand-packing stones in wire-crates; excluding cost of crates and stones 28 Supply and fixing of 3mm dia B.A wire woven crates with lid/ binding wire (4""x4"" mesh) as per ISI specification including all carriages (manual/ Mechanical) up to site of work complete job 29 Supply of Stone boulder (nallah) nominal size 225 mm 30 Constructing muthu bunds, comprising boulders and wood bushes in alternate layers; including working in water situations. 31 Engagement of labours for various jobs (unskilled) 32 Engagement of labours for various jobs (skilled) 33 Providing and laying non-pressure NP2 class (light duty) R.C.C. pipeswith collars jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement: 2 fine sand) including testing of joints etc. complete.250 mm dia. R.C.C. pipe 34 300 mm dia. R.C.C. pipe 35 450 mm dia. R.C.C. pipe 36 600 mm dia. R.C.C. pipe 37 900 mm dia. R.C.C. pipe 38 1000 mm dia. R.C.C. pipe 39 1200 mm dia. R.C.C. pipe 40 Providing and laying PVC pipes including all carriages complete job, 150mm dia 41 Felling trees of any girth to remove encroachments/ blockades from the canal embankments 42 Provision for providing driving of kikar piles of avg. dia 6" to 8" (avg. width 1-6") and required length as per site conditions including making of pile points. The jon shall also include all sort sof carriage upto site of work i.e manual as well as mechanical etc. complete job. 43 Supply of heavy duty Axe with strong wooden handle sharpened blade in solid strong one piece iron 44 Supply of petrol 45 Supply of M-oil 46 Supply of Sledge Hammer (2kg/5kg) of standardquality as directed by engineer in charge 47 Supply of shovel of standard quality as directed by Engineer-in-charge 48 Repairs, fabrications, installation and replacement of damaged/worn parts including testing of hudraulic iron gate of required size and thickness made of MS plate, ISMC, sill girder with single/double winch machine of required capacity made out of Gun Metal BUsh gearing, worm and gear type double treaded provided with handle and locking arrangements to facilitate raising and lowering of gate with winch rods of required dia full threaded of required length. The gate should be applied red oxide paint and synthetic enamel paint in the coats with rubber seal etc. complete job commissioning and testing charges included all carriages by mechanical and manual labour including cost of plugging during exacution of work by using sand.earth filled bags and its removal after comletion and desilting, etc. 49 Cost of Hiring boat (capacity upto 20 cum) including charges of Boatman. 50 Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. 51 Finishing with Deluxe multi surface paint system for interiors and exteriors using primer as per manufacturers’ specifications:Painting steel work with deluxe multi surface paint of required shade to give an even shade. Two or more coats applied @ 0.90litre/10sqm over an under coat of primer applied @ 0.80litre/10sqm of approved brand and manufacture 52 Demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per direction of Engineer-in charge:1:3:6 or richer mix (i/c equivalent design mix) 53 1:4:8 or leaner mix (i/c equivalent design mix) 54 Demolishing R.C.C. work manually/by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge. 55 Extra for cutting reinforcement bars manually/by mechanical means in R.C.C. or R.B. work (Payment shall be made on the cross sectional areas of R.C.C. or R.B. work) as per direction of Engineer-in-charge. 56 Extra for scrapping, cleaning and straightening reinforcement from R.C.C. or R.B. work 57 Demolishing brick work manually/by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge:In lime mortar 58 In cement mortar 59 Removing mortar from bricks and cleaning bricks including stacking within a lead of 50 m. (stacks of cleaned bricks shall be measured) :From brick work in lime mortar 60 From brick work in cement mortar 61 Demolishing stone rubble masonry manually/by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge:In lime mortar 62 In Cement mortar 63 Removing mortar from and cleaning stones and concrete articles (net quantity of stacks of cleaned materials will be measured)In lime Mortar 64 In cement mortar 65 Dismantling steel work in single sections including dismembering and stacking within 50 meters lead in. R.S. Joists 66 Channels, angles, tees and flats 67 Dismantling steel work in built up sections in angles, tees, flats and channels including all gusset plates, bolts, nuts, cutting rivets, welding etc. including dismembering and stacking within 50 meters lead. 68 Dismantling roofing including ridges, hips valleys and gutters etc., and stacking the material within 50 meters lead of :G.S. Sheet 69 Maintenance of existing gate shutters to remove any dents and kinks including maintenance of winch rods and winch machines by greasing, removing bends and kinks and all necessary repair ot make functional complete job 70 12mm Cement plaster of mix:1 : 4 ( 1 cement : 4 fine sand) 71 Structural steel work in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.Welded 72 Carriage of Material by Mechanical Transport including loading, unloading and stacking.Sand/ 20mm aggregate avg lead 01 km 73 avg lead 02 km 74 avg lead 03 km 75 avg lead 04 km 76 avg lead 05 km 77 avg lead 06 km 78 avg lead 07 km 79 avg lead 08 km 80 avg lead 09 km 81 avg lead of 10 Km 82 Stone agg 40mm from avg lead 01km 83 avg lead 02km 84 avg lead 03km 85 avg lead 04km 86 avg lead 05km 87 Stone/ Soling stone from avg lead 01Km 88 avg lead 02Km 89 avg lead 03Km 90 avg lead 04Km 91 avg lead 05Km 92 Earth from avg lead 01Km 93 avg lead 02Km 94 avg lead 03Km 95 avg lead 04Km 96 avg lead 05Km 97 250mm RCC Pipe avg lead 01Km 98 avg lead 02Km 99 avg lead 03Km 100 avg lead 04Km 101 avg lead 05Km 102 300 mm RCC Pipe avg lead 01Km 103 avg lead 02Km 104 avg lead 03Km 105 avg lead 04Km 106 avg lead 05Km 107 600 mm RCC Pipe avg lead 01Km 108 avg lead 02Km 109 avg lead 03Km 110 avg lead 04Km 111 avg lead 05Km 112 900 mm RCC Pipe avg lead 01Km 113 avg lead 02Km 114 avg lead 03Km 115 avg lead 04Km 116 avg lead 05Km 117 1000/1200 mm Dia RCC Pipe avg. lead 01 km 118 avg. lead 02 km 119 avg. lead 03 km 120 avg. lead 04 km 121 avg. lead 05 km 122 Carriage of materials from road sideto actual site of work by manual transport, including loading, unloading and stacking etc.Cement from avg lead 100mtr 123 Cement from avg lead 50mtr 124 Sand/ 20mm agg. from an avg lead of 100 m 125 Stones from avg lead 100m 126 Stones from avg lead 50m 127 40mm stone agg from avg lead 100m 128 40mm stone agg from avg lead 50m 129 Earth from avg lead of 50m 130 Earth from avg lead of 100m 131 Crates from avg lead 50m 132 Crates from avg lead 100m
|