The Subject Of The Contract Is The Implementation Of Construction Works As Part Of The Investment Task Entitled Modernization Of The Sports Complex My Playground - Orlik 2012 In Rudniki. Investment Involvement Consists In Modernizing The Existing Sports Complex My Playground - Orlik 2012 In Rudniki And Wall Construction The Task Is Co -Financed From The Fund For The Development Of Physical Culture, Which Is The Disposer Of The Minister Of Sport And Tourism As Part Of The Program Of Modernization Of Sports Complexes Moje Playground - Orlik 2012 - Edition - Edition - Edition - Edition 2024. Spinding. Modernization Of The Orlik Will Include: 1) Replacement Of The Surface From The Synthetic Grass Of The Football Pitch And Goals With Mesh And Footballs (Disassembly And Utilization Of The Current Surface, Laying A New Surface, Exchange Of Goals, Renovation Of Footballs); 2) Repair Of The Surface Of The Polyurethane Multi -Functional Pitch, Strengthening Of The Surface And The Surface Of The Polyurethane Pitch, Surface Strengthening, And Surface Repair, Repair Of Footballs, Surface Repair And Repair. Renewal Of The Game Line; The Repair Will Consist Of Cleaning The Surface Of The Pitch, Its Impregnation And Laying A New Mat. 8 Mm From Epdm; 3) Replacement Of Boards And Basketball Rims; 4) Repair Of Damaged Pitch Fence Elements; 5) Renovation Of The Social And Soccer Facilities Building; 6) Renovation Of The Drainage Installation Of The Field By Replacing The Wells; 7) Correction Of The Position Of Pedestrian Routes (Resulting From The Replacement Of The Above-Mentioned Studdle). Buldering (External): 1) Year-Round, Made Of Laminate, Resistant To Weather Conditions Up To 3 M High; 2) Intended For Climbing Without Belaying For People Of All Ages And Different Degrees Of Skills In The Field Of Recreational And Sporting Climbing; 3) With Sand-Gravel Sand Absorbing Surfaces; 4) Equipped With 160 Pieces Of Climbing Grains; 5) Led Lighting With 46W Led Lighting, Which Will Be Mounted On The Existing Lighting Mast Of The Orlik.Ww. The Bouldering Wall Will Be Located Next To The Orlik Object, Creating One Common Sports Base. It Will Enable The Comprehensive Sport Development Of The Commune And The Region. Investments Investment: Ul. Wieluńska 6, 46-325 Rudniki, Plot: 160806_2.00196.Ar_3.52-Softener Conditions Of The Execution Of The Works: The Construction Site Will Be Reported To The Contractor In The First Week Of June 2025, With The Proviso That The Contractor Will Be Provided. Works, Electricity, Water For Construction Purposes And Other Necessary Media. In Connection With The Immediate Vicinity Of The School And Nursery, The Transferred Area Should Be Protected Against The Introduction Of Bystanders. The Concise Range Of The Order - The Works Are Included In The Design Documentation Of The Technical Specifications Of The Performance And Receipt Of Works And Prevenues Of Works - Constituting Annex 6 To Swz. The Minimum Warranty Period For The Subject Of The
Contact Information
Address
Gmina Rudniki,Rudniki,46-325,Opolskie,Pl524 - Opolski
Contact No.
343595072
Email
przetargi@rudniki.pl
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 94462471
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.