1. The Subject Of The Contract Includes The Construction Of An Internal Municipal Road On The Section From Dg Ul. Zakopiańska In The Field Of Road Construction, Construction Of Drainage, Communication Routes Together With The Construction Of Technical Infrastructure In Babice. 2. Characteristics Of Construction Works Covered By The Subject Of The Contract: 1) Construction Of An Internal Road From Km 0+000.00 To Km 0.407.92: A) Preparatory Works, B) Mowing Of One -Year Self -Seeding, C) Removal Of Shrubs, D) Cutting Of Trees, E) Demolition Works, F) Sewage Works: Assembly Of Reinforced Concrete Tube (Wipro), G), G), G), G) Installation Works, Assembly Of Street Sewage Wells, Inspection Wells, H) Protection Of Underground Armaments, I) Earthworks, Embankment) Profiling And Density Of The Substrate, K) Making A Foundation From A Cement Stabilized Ground, L) Making The Drainage Layer Made And Mechanically Thickened - Frosty Layer, M) Basic From Stone Aggregate Gr 20 Cm, N) Making A Layer Of Foundation From Broken Aggregate 15 Cm- Lower Layer Of Pavements, O) Making A Layer Of Foundation From Broken Aggregate Gr 10 Cm- Upper Layer- Pavements, P) Making A Layer Of Foundation From Broken Aggregate 10Cm Grade 10Cm- Road, Q) Charming Of Existing Pavements On Connections, R) Works Paving, P.) Topic Works Made Of Cobblestones Gr. 8 Cm-Pavement, T) Sprinkling Road Surfaces Asphalt, U) Making Asphalt Pavement Made Of Mineral-Asphalt Mixtures Ac 16W Thick 8Cm-Binding Layer, V) Sprinkling Road Surfaces Asphalt, In) Making Asphalt Surface Made Of Mineral-Asphalt Mixtures Ac 11S Road Marking, Y) Regulations Of Wells. 2) Tank Performance: A) Preparatory Works, B) Sewage Works - Excavation, C) Making A Bedding Under Wells, Concrete Outlets And Covering The Collector (50 Cm) And Sand Well. 10 Cm, D) Execution Of A Gravel Bench At The Bottom Of The Tank - 40 Cm Thick, E) Installation Of Sealed Passages In Concrete Wells, Inspection Wells, Collector, F) Building Prefabricated Concrete Outlets, G) Building Feedback Flap With Weight, H) Earthworks, Embankment, And) Stabilized With Cement, K) Making A Drainage Layer Made And Mechanically Compacted- Frost-Protected Layer, L) Making A Layer Of Basic Foundation Made Of Stone Aggregate Gr 16 Cm, M) Making A Layer Of Foundation From A Broken Aggregate Gr 10 Cm- Upper Layer, N) Paving Works, O) Panel Works Segmental. Requirements For Availability For Disabled People Or Design For All Users (Article 100 (1) Of The Public Procurement Law): Project Documentation On The Basis Of Which The Contract Will Be Carried Out In Accordance With The Standards And Applicable Law In The Scope Of Availability For All Users, And In Particular For The Purpose Of Disabled People. 3. The Necessary Work To Be Done Also Includes: A) Preparing A Collaudation Report For The Road, Which Includes:- As-Built Documentation- Geodetic Service Of The Task Together With As-Built Inventory And Notification To The Geodetic Documentation Center- Introduction Of
|