The Subject Of The Contract Is The Renovation Of Corridors In The Building Of The Poviat Eldership In Wyszków At Aleja Róż 2 In Part A, B And C Consisting Of: 1. Demolition Of Suspended Ceilings, 2. Demolition Of The Floor From Tiles. 3. Making A New Tile Floor - Class R11.4. Powliks Made Of Tiles With A Height Of 12Cm.5. Making New Suspended Ceilings With Filling Ceiling Plates, E.G. Rigips Gyptone; The Grate Structure Is Visible With The Main Profiles Every 60Cm. 6. Building A Vertical Central Heating Installation On Metal Grate With Gk Plates And Painting Twice With Latex Paints. 7. Making Pebble Plasters On The Walls. 8. Disassembly Of Existing Doors With Frames. 9. Installation Of New Interior Doors Of Single -Leaf Aluminum Full Of Horizontal Crossbar With A Frame (Filling: Bl 1Mm Asp + Styrodur 20Mm + Bl. 1Mm Asp) With A Self -Clipped Closer With A Lock And Stainless Steel Handle - Door Width Of The Door 80 Cm And 1 Pc. 90 Cm /Door To The Bathroom. Making Complementary Machining And Plasters With Double Paint Painting Wall Surfaces After Replacing The Door Joinery. 11. Double -Sided Painting With Oil Or Phthalic Paint Left Doors In The Amount Of 4 Pcs. 12. Electrical Works Related To The Replacement Of Existing Led Lighting In Suspended Ceilings / Led Led Luminaires 600X600 To 40W, 4000K Flat Housing /.13. Disassembly And Re -Assembly On The New Suspended Ceiling Of Emergency And Evacuation Lighting. 14. Disassembly And Re -Assembly On The New Suspended Ceiling Of Fire Detectors 15. Installation Channels For Cable Cables. 16. Measurements And Checking Of The Insulation Status Of Electrical Installations. 17. Cleaning The Place Of Works18. Removal And Utilization Of Waste From Construction. 19. The Works Will Be Carried Out During The Work Of The Poviat Eldership In Wyszków, On The Side Of The Contractor It Is Required In The Event Of A Collision, Moving And Securing The Existing Furniture And Equipment At The Place Of Works And After The Work Is Completed Restoration Of The Settings Of Furniture And Equipment As Well As Cleaning The Rooms 20. Carrying Out Works In A Multi -Pipe System, I.E. After The Office Hours And On Non -Working Days In The Case Of Performing Works That Will Interfere And Disturb The Work Of The Office, And If It Is Necessary To Maintain The Date Of The Contract. The Set Description Of Works Is Determined By The Works Of Works Constituting Annex 7 To Swz. The Order Of The Contract Should Be Carried Out In Accordance With Applicable Law, Technical Knowledge, Technical Concluded With The Contracting Authority, Arrangements With The Ordering Party Made During The Implementation Of The Subject Of The Contract. New: The Colors Of The Materials Used Should Be Agreed With The Employer At The Stage Of Performing The Work. All Requirements Specified In The Documents Indicated Above Constitute Minimum Requirements, And Their Fulfillment Is Obligatory. Failure To Meet The Above The Minimum Requirements Will Result In The Rejection
Contact Information
Address
Powiat Wyszkowski,Wyszków,07-200,Mazowieckie,Pl924 - Ostrołęcki
Contact No.
297435935
Email
starostwo@powiat-wyszkowski.pl
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 94462383
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.