1. Name Of The Task: Expansion Of The Water Supply Network At Ul. Solarnia 1) Type Of Order: Construction Work. 2) The Subject Of The Contract Includes: A) Construction Of The Segment Of The Water Supply Network Dz 125Mm Pe100rc Sdr11 With A Length Of About 470M; B) Army Hydrant Dn80 - 1 Kpl; C) Inclusion Of The Implemented Section Into Existing Water Supply Networks/Solar Attempts, Tests, Checks, As -Built Documentation And Geodetic Inventory Of The Completed Network; The Basis For Implementation Will Be The Project Documentation Attached To The Procedure. The Works Will Be Carried Out Entirely In Private Areas And Forest Areas Owned By The State Forests. Technical Requirements. The Water Supply Transfer Was Agreed With The Owners Of The Area Through Which It Runs. At The Design Stage, The Contracting Authority Obtained The Consent Of The Owners Of These Areas. The W1 Disorder - It Runs Through Private Areas. In These Areas, The Start Of Works Should Be Preceded By A Notification Of The Owners Of The Planned Date, Duration Of Works And Difficulties In Access To The Property. The Employer Prefers Works In Trenchless Technology. In The Case Of The Excavation Method, The Surface Should Be Reproduced To The Original State With Full Maintenance Of The Functional Properties. Episode W14 - W33 Runs Through Forest Areas. The Works On This Section Should Be Performed In Accordance With The Conditions Issued By The Regional Directorate Of State Forests, Letter Es.2217.1.431.2021.As Issued On 28.09.2021. The Commencement Of Works Will Be Possible After Effective Notification Of The Representative Of The Representative Of The Representative Protocol Indicated By The Owner. Perform The Whole Episode. The Owner Of The Area Does Not Agree To The Works In Excavation Technology. The Contractor Performing Works In Another Technology Will Result In The Withdrawal Of The Owners Consent By Interrupting The Works Due To The Contractors Fault. The Contractor Will Ensure The Implementation Of Works Under The Supervision Of A Construction Manager With The Right To Build A Installation Specialty In The Field Of Water And Sewage Networks And Installations. In The Event Of Damage To The Water Supply, Sewage, Energy, Telecommunications Heating Networks When Conducting Works Related To The Construction Of The Sewage System, The Contractor Removes Damage At Its Own Expense From Own Materials Under The Direct Supervision Of The Network Gestor. The Cost Of Supervision Is Borne By The Contractor. In The Event Of Damage To The Drainage System, It Should Be Reproduced From Own Materials Under The Direct Supervision Of An Investor Or Representatives Of A Water Company Or Owner Of The Property. The Contractor Is Obliged To Prepare Photographic Documentation Along With The Marking Of The Place Of Damage. The Organization Of The Construction Facilities And Its Liquidation, Including The Implementation Of The Temporary Road Organization (If It Is Required By The Road Administrator) And
Contact Information
Address
Gmina Ornontowice,Ornontowice,43-178,Śląskie,Pl22c - Tyski
Email
zp@ornontowice.pl
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 94462342
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.